Templeborough Biomass Power Plant: Difference between revisions

Bin52 (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
 
Line 1: Line 1:
A [[Biomass EfW]] facility with [[CHP]] [[Templeborough Biomass Power Plant]] is based on processing up to 260,000 tonnes per annum of [[Wood Waste]] pellet generating 41 MWe<ref name="tem">[https://www.templeboroughbiomass.com/templeborough-biomass-power-plant/ Templeborough Biomass Plant]</ref>. The plant is located in Templeborough on the River Don, near Rotherham.
A [[Biomass EfW]] facility with [[CHP]] [[Templeborough Biomass Power Plant]] is based on processing up to 260,000 tonnes per annum of [[Wood Waste]] pellet generating 41 MWe<ref name="tem">[https://www.templeboroughbiomass.com/templeborough-biomass-power-plant/ Templeborough Biomass Plant]</ref>. The plant is located in Templeborough on the River Don, near Rotherham.
[[Category:Biomass EfW Plants]]{{#vardefine: epr|NP3805BY}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|NP3805BY}}
{{BiomassPlant|NAME=Templeborough Biomass Power Plant|id=80|EPR={{#var: epr}}}}
{{BiomassPlant|NAME=Templeborough Biomass Power Plant|id=80|EPR={{#var:epr}}}}
[[File:Templeborough.jpg|300px|left]]__TOC__
[[File:Templeborough.jpg|300px|left]]__TOC__
<br clear="left"/>
<br clear="left"/>