Dudley EfW: Difference between revisions

Bin52 (talk | contribs)
m minor text changes
Bin52 (talk | contribs)
No edit summary
 
(14 intermediate revisions by 4 users not shown)
Line 1: Line 1:
[[File:Dudley.png|300px|left|Dudley EFW]]
{{#vardefine: epr|HP3247QS}}
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=AP3435SD|id=37}}
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Dudley has permitted operational capacity of 105,000 tonnes per annum.
{{EfWTemplate|EPR={{#var: epr}}|id=37}}
[[File:Dudley.png|300px|left|Dudley EFW]]__TOC__
<br clear='left'/>


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Dudley has permitted operational capacity of 105,000 tonnes per annum, operated and owned by [[MES Environmental]], part of the [[CNIM]] Group. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] <ref>[https://www.mesenvironmental.co.uk/index.php/operations/dudley/ MSES Website]</ref>.
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. The facility was operated by [[MES Environmental]], part of [[Paprec]], having agreed to buy out [[CNIM]] in March 2021<ref>[https://cnim.com/sites/default/files/media/Communiqu%C3%A9s%20financiers/2021-03-25-CNIM-Communiqu%C3%A9-EN.pdf CNIM Press Release]</ref>. In early 2024 a contract was awarded <ref>https://councilnews.dudley.gov.uk/news/new-contract-could-save-the-council-up-to-gbp-2million-a-year</ref> for the operation of the facility to [[Urbaser]] (which was subsequently acquired by [[FCC]]). Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] <ref>[https://www.mesenvironmental.co.uk/index.php/operations/dudley/ MSES Website]</ref>.


==History==
==History==
Line 10: Line 13:


==Plant==
==Plant==
The plant comprises two lines via standard combustion CNIM boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 6 tonnes per hour or up to 99,000 tonnes per annum and generating 7 MWe.
The plant comprises two lines via standard [[combustion]] [[CNIM]] boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 6 tonnes per hour or up to 99,000 tonnes per annum and generating 7 MWe.
 
==Local Authority Users==


{{EfWLAData|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />