Vine Street EfW (Kirklees EfW): Difference between revisions
No edit summary |
m Admin moved page Vine Street EfW (Kirkless EfW) to Vine Street EfW (Kirklees EfW) without leaving a redirect: Misspelled title |
||
| (2 intermediate revisions by one other user not shown) | |||
| Line 1: | Line 1: | ||
[[ | {{#vardefine:epr|BJ6178IX}}[[Category:EfW Plants]] | ||
[[ | An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Kirklees site has permitted operational capacity of 160,000 tonnes per annum, and is owned and operated by [[Suez]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]. | ||
{{EfWTemplate|EPR= | {{EfWTemplate|EPR={{#var:epr}}|id=31}}[[File:Suez Kirklees.png|180px|left|Suez Kirklees]]__TOC__<br clear='left' /> | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Kirklees site has permitted operational capacity of 160,000 tonnes per annum, and is owned and operated by [[Suez]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]. | An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Kirklees site has permitted operational capacity of 160,000 tonnes per annum, and is owned and operated by [[Suez]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]. | ||
==History== | ==History== | ||
The Kirklees facility, in Huddersfield, was built primarily to service [[Kirklees Metropolitan Council]] under a 25 year [[PFI]] contract, signed in 1998 and due for completion in 2023 - but with the option to extend for five years to 2028 (and potentially operate to 2036)<ref>[https://www.kirklees.gov.uk/beta/planning-policy/pdf/supportingDocuments/mineralsWaste/Waste-Needs-Assessment-2.pdf Kirklees Waste Needs Assessment]</ref>. | The Kirklees facility, in Huddersfield, was built primarily to service [[Kirklees Metropolitan Council]] under a 25 year [[PFI]] contract, signed in 1998 and due for completion in 2023 - but with the option to extend for five years to 2028 (and potentially operate to 2036)<ref>[https://www.kirklees.gov.uk/beta/planning-policy/pdf/supportingDocuments/mineralsWaste/Waste-Needs-Assessment-2.pdf Kirklees Waste Needs Assessment]</ref>. | ||
| Line 13: | Line 11: | ||
The plant is 1 line with a design capacity capable of 17 tonnes/hour equivalent to around 139,000 tonnes per annum. Electricity is generated via standard combustion technology, utiliziing fluidised bed technology ROWITEC, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]]. The technology is understood to be capable of operating in a range of [[CV]] of between 6.5 and 30.0 MJ/kg depending on configuration<ref>[https://mafiadoc.com/rowitec-fluidized-bed_5a2b2dad1723dd3d745e24de.html/ Lentjes Website]</ref>. | The plant is 1 line with a design capacity capable of 17 tonnes/hour equivalent to around 139,000 tonnes per annum. Electricity is generated via standard combustion technology, utiliziing fluidised bed technology ROWITEC, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]]. The technology is understood to be capable of operating in a range of [[CV]] of between 6.5 and 30.0 MJ/kg depending on configuration<ref>[https://mafiadoc.com/rowitec-fluidized-bed_5a2b2dad1723dd3d745e24de.html/ Lentjes Website]</ref>. | ||
= | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
{{# | |||
{| | |||
==References== | ==References== | ||
<references /> | <references /> | ||