Vine Street EfW (Kirklees EfW): Difference between revisions

Bin52 (talk | contribs)
m minor text changes
m Admin moved page Vine Street EfW (Kirkless EfW) to Vine Street EfW (Kirklees EfW) without leaving a redirect: Misspelled title
 
(7 intermediate revisions by 4 users not shown)
Line 1: Line 1:
[[File:Suez Kirklees.png|180px|left|Suez Kirklees]]
{{#vardefine:epr|BJ6178IX}}[[Category:EfW Plants]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Kirklees site has permitted operational capacity of 160,000 tonnes per annum, and is owned and operated by  [[Suez]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]].
{{EfWTemplate|EPR=BJ6178IX|id=31}}
{{EfWTemplate|EPR={{#var:epr}}|id=31}}[[File:Suez Kirklees.png|180px|left|Suez Kirklees]]__TOC__<br clear='left' />
 
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Kirklees site has permitted operational capacity of 160,000 tonnes per annum, and is owned and operated by  [[Suez]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]].  
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Kirklees site has permitted operational capacity of 160,000 tonnes per annum, and is owned and operated by  [[Suez]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]].  
==History==
==History==
The Kirklees facility, in Huddersfield, was built primarily to service [[Kirklees Metropolitan Council]] under a 25 year [[PFI]] contract, signed in 1998 and due for completion in 2023 - but with the option to extend for five years to 2028 (and potentially operate to 2036)<ref>[https://www.kirklees.gov.uk/beta/planning-policy/pdf/supportingDocuments/mineralsWaste/Waste-Needs-Assessment-2.pdf Kirklees Waste Needs Assessment]</ref>.  
The Kirklees facility, in Huddersfield, was built primarily to service [[Kirklees Metropolitan Council]] under a 25 year [[PFI]] contract, signed in 1998 and due for completion in 2023 - but with the option to extend for five years to 2028 (and potentially operate to 2036)<ref>[https://www.kirklees.gov.uk/beta/planning-policy/pdf/supportingDocuments/mineralsWaste/Waste-Needs-Assessment-2.pdf Kirklees Waste Needs Assessment]</ref>.  


==Plant==
==Plant==
The plant is assumed to have been built by [[Lentjes]] (renamed [[Lurgi]] in 2006 and sold to [[A-Tec Industries AG]] in 2007) under a turnkey contract with a similar approach to [[Allington EfW]]. The facility commenced operation in 2002.
The plant is assumed to have been built by [[Lentjes]] (renamed [[Lurgi]] in 2006 and sold to [[A-Tec Industries AG]] in 2007) under a turnkey contract with a similar approach to [[Allington EFW]]. The facility commenced operation in 2002.
The plant is 1 line with a design capacity capable of 17 tonnes/hour equivalent to around 139,000 tonnes per annum. Electricity is generated via standard combustion technology, utiliziing fluidised bed technology ROWITEC, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]]). The technology is understood to be capable of operating in a range of [[CV]] of between 6.5 and 30.0 MJ/kg depending on configuration<ref>[https://mafiadoc.com/rowitec-fluidized-bed_5a2b2dad1723dd3d745e24de.html/ Lentjes Website]</ref>.  
The plant is 1 line with a design capacity capable of 17 tonnes/hour equivalent to around 139,000 tonnes per annum. Electricity is generated via standard combustion technology, utiliziing fluidised bed technology ROWITEC, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]]. The technology is understood to be capable of operating in a range of [[CV]] of between 6.5 and 30.0 MJ/kg depending on configuration<ref>[https://mafiadoc.com/rowitec-fluidized-bed_5a2b2dad1723dd3d745e24de.html/ Lentjes Website]</ref>.


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}


==References==
==References==
<references />
<references />