Millerhill EfW: Difference between revisions
add page specific text |
|||
| (One intermediate revision by the same user not shown) | |||
| Line 14: | Line 14: | ||
==Plant== | ==Plant== | ||
FCC Environment appointed [[Hitachi Zosen Inova]] (HZI)<ref>[https://www. | FCC Environment appointed [[Hitachi Zosen Inova]] (HZI)<ref>[https://www.kanadevia-inova.com/projects/edinburgh-WtE/ PDF Fact Sheet accessed 26th Feb 2025]</ref> and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility. | ||
==Local Authority Data== | ==Local Authority Data== | ||