Millerhill EfW: Difference between revisions

Bin52 (talk | contribs)
add page specific text
Bin52 (talk | contribs)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:


==Plant==
==Plant==
FCC Environment appointed [[Hitachi Zosen Inova]] (HZI)<ref>[https://www.hz-inova.com/projects/edinburgh-efw/ Hitachi Zosen Inova Website]</ref> and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility.
FCC Environment appointed [[Hitachi Zosen Inova]] (HZI)<ref>[https://www.kanadevia-inova.com/projects/edinburgh-WtE/ PDF Fact Sheet accessed 26th Feb 2025]</ref> and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility.


==Local Authority Data==
==Local Authority Data==