Protos EFW: Difference between revisions

Bin52 (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
 
Line 11: Line 11:


==Plant==
==Plant==
The facility will use conventional [[grate]] [[combustion]] technology comprising two lines<ref>https://www.standardkessel-baumgarte.com/en/news/news-details.html?newsid=659</ref> provided by [[Standardkessell Baumgarte GmbH]] and delivered by them in a joint venture with [[Mytilineos S.A]] over a three year construction period at a cost of c.£345 to £355 million<ref name="ref1" />.   
The facility will use conventional [[grate]] [[combustion]] technology comprising two lines<ref>https://www.standardkessel-baumgarte.com/en/references/efw-plant-in-cheshire-great-britain</ref> provided by [[Standardkessell Baumgarte GmbH]] and delivered by them in a joint venture with [[Mytilineos S.A]] over a three year construction period at a cost of c.£345 to £355 million<ref name="ref1" />.   


==Waste Input==
==Waste Input==