Thetford Power Station: Difference between revisions

Bin52 (talk | contribs)
add page specific text
mNo edit summary
Tag: Manual revert
 
(2 intermediate revisions by 2 users not shown)
Line 9: Line 9:


==Plant==
==Plant==
The plant's first power was generated in June 1999, with [[Taylor Woodrow Management and Engineering]] carrying out the design and construction turnkey package at a cost of £69m. The Fuel handling was by [[Birtley Engineering plc]], the [[Grate]] by [[Detroit Stoker Inc.]], the [[boiler]] by [[Foster Wheeler Ltd]] (Canada) and the turbine by [[Ansaldo Energia SpA]]<ref>http://www.engineering-timelines.com/scripts/engineeringItem.asp?id=992</ref>
The plant's first power was generated in June 1999, with [[Taylor Woodrow Management and Engineering]] carrying out the design and construction turnkey package at a cost of £69m. The Fuel handling was by [[Birtley Engineering plc]], the ''roto grate''<ref>Annual Report 2021</ref> ([[Grate]]) by [[Detroit Stoker Inc.]], the [[boiler]] by [[Foster Wheeler Ltd]] (Canada) and the turbine by [[Ansaldo Energia SpA]]<ref>http://www.engineering-timelines.com/scripts/engineeringItem.asp?id=992</ref>


{{BioSustain|EPR={{#var: epr}}}}
{{BioSustain|EPR={{#var: epr}}}}