==Summary==
==Summary==
Hooton Bio Power is an EfW facility currently under construction in Ellesmere Port, Cheshire. The facility will utilise [[Advanced Combustion Technologies]] to process 240,000 tonnes of MSW ([[Municipal Solid Waste]]) per annum and generate 25.2 MW of electricity which will be exported to the grid after the facility’s own power needs are met. The facility has been developed by [[CoGen]] with [[BWSC]] as the turnkey EPC contractor and O&M provider. In 2018, the facility was sold to Aviva investors<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — CoGen. Online. CoGen. [Accessed 14 Feb. 2020].]</ref>.
Hooton Bio Power is an EfW facility currently under construction in Ellesmere Port, Cheshire. The facility will utilise [[Advanced Conversion Technology|Advanced Conversion Technologies]] to process 240,000 tonnes of MSW ([[Municipal Solid Waste]]) per annum and generate 25.2 MW of electricity which will be exported to the grid after the facility’s own power needs are met. The facility has been developed by [[CoGen]] with [[BWSC]] as the turnkey EPC contractor and O&M provider. In 2018, the facility was sold to Aviva investors<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — CoGen. Online. CoGen. [Accessed 14 Feb. 2020].]</ref>.


==History==
==History==