An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life [[Edmonton EcoPark EfW]] facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current 675,000 tonnes per annum.  
An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life [[Edmonton EcoPark EfW]] facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current listed 675,000 tonnes per annum (although this is reported at 500,000 tonnes per annum in some listings).  


==Technology==
==Technology==
Line 9: Line 9:


==Construction==
==Construction==
The plant commenced construction with initial ground preparation works in January 2019 by . A legal challenge has been raised by  on the development. ref>[https://www.letsrecycle.com/news/latest-news/hull-gasification-project-appoints-new-contractor/ Letsrecycle Article]</ref>.  
The plant commenced construction with initial ground preparation works in January 2019 by [[Buckingham Group Contracting]] with an operational date expected for 2025<ref>[https://www.letsrecycle.com/news/latest-news/work-begins-on-new-edmonton-efw-facility/ Letsrecycle Article]</ref>. A legal challenge was raised in late 2019 on environmental grounds<ref>[https://www.letsrecycle.com/news/latest-news/edmonton-efw-crucial-for-climate-despite-legal-challenge/ Letsrecycle Article]</ref>.  


==Waste Input==
==Waste Input==
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]]. The majority of supply will continue to be underpinned by [[NLWA]].