SynTec Energy Center (Wednesbury): Difference between revisions
add page specific text |
Arctellion (talk | contribs) No edit summary |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
[[ | {{#vardefine:epr|Tbc21}}[[Category:EfW Plants]] | ||
[[ | |||
{{EfWTemplate|EPR= | An [[EfW]] facility based upon [[Gasification]] technology. [[Syntech Bioenergy LLC]] has proposed their modular technology at this Wednesbury site. | ||
{{EfWTemplate|EPR={{#var:epr}}|id=68}}[[File:SynTec Biomax.png|230px|left|Picture of Biomax Technology from SynTech Bioenergy Website]]__TOC__<br clear='left'/> | |||
==Summary== | ==Summary== | ||
Line 7: | Line 9: | ||
==Technology== | ==Technology== | ||
The plant is based on the [[Syntech Bioenergy LLC]] called [[Biomax]]. | The plant is based on the [[Syntech Bioenergy LLC]] technology called [[Biomax]]<ref>[https://www.syntechbioenergy.com/how-it-works SynTech Bioenergy LLC Website]</ref>. | ||
==Construction== | ==Construction== |
Latest revision as of 08:03, 19 August 2021
An EfW facility based upon Gasification technology. Syntech Bioenergy LLC has proposed their modular technology at this Wednesbury site.
Sustainable Energy Centre Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Tbc21 |
Operator | Kew Technologies |
Region | West Midlands |
Operational Capacity | 15ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 2.00MWe |
Number of Lines | 0 |
Number of Turbines | 0 |
CHP | Yes |
Technology Approach | ACT |
Funding Type | Merchant |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon Gasification technology. Syntech Bioenergy LLC has proposed their modular technology at this Wednesbury site.
Technology
The plant is based on the Syntech Bioenergy LLC technology called Biomax[1].
Construction
There is no information on the current status of funding or construction of the project in the public domain.
Waste Input
The overall facility was designed to run on 14,000 tonnes per annum of MSW and is designed to be able to receive a range of Biomass and Agricultural Waste as well.