Swindon Energy Plant: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
[[Category:EfW Plants]] | {{#vardefine:epr|Tbc18}}[[Category:EfW Plants]] | ||
{{EfWTemplate|EPR= | An [[EfW]] facility originally based upon [[Gasification]] technology. Consented on [[Crapper and Sons]] [[Landfill]] site in Wootton Basset, as part of a number of other facilities including a [[Biomass]] project from [[Waste Wood]] and a [[Mechanical Treatment]] process. The initial works were reported as commenced, but no construction is understood to have progressed on the site of the [[EfW]] facility to date. | ||
{{EfWTemplate|EPR={{#var:epr}}|id=65}}__TOC__<br clear='left'/> | |||
==Summary== | ==Summary== |
Latest revision as of 08:06, 19 August 2021
An EfW facility originally based upon Gasification technology. Consented on Crapper and Sons Landfill site in Wootton Basset, as part of a number of other facilities including a Biomass project from Waste Wood and a Mechanical Treatment process. The initial works were reported as commenced, but no construction is understood to have progressed on the site of the EfW facility to date.
Swindon Energy Plant Planning | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Tbc18 |
Operator | Crapper and Sons |
Region | South West |
Operational Capacity | 70ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 6.00MWe |
Number of Lines | 0 |
Number of Turbines | 0 |
CHP | Yes |
Technology Approach | ACT |
Funding Type | Merchant |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility originally based upon Gasification technology. Consented on Crapper and Sons Landfill site in Wootton Basset, as part of a number of other facilities including a Biomass project from Waste Wood and a Mechanical Treatment process. The initial works were reported as commenced, but no construction is understood to have progressed on the site of the EfW facility to date.
Technology
The plant was originally designed based on modular Gasification technology.
Construction
There is no information on the current status of funding or construction of the project in the public domain, the company website notes that planning is in place in 2016 but has no other detail[1].
Waste Input
The plant was designed to run on 70,000 tonnes per annum of prepared RDF from an adjacent Mechanical Treatment facility.