Peterborough EfW: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
[[ | {{#vardefine:epr|NP3638ZS}}[[Category:EfW Plants]] | ||
[[ | An [[EfW]] facility based upon conventional combustion technology which is considered an [[ERF]] as a result of having [[R1]] status. Peterborough has permitted operational capacity of 85,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] <ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/peterborough-erf/ Viridor Website]</ref>.{{EfWTemplate|EPR={{#var:epr}}|id=40}}[[File:Viridor Peterborough.png|350px|left]]__TOC__<br clear='left' /> | ||
{{EfWTemplate|EPR= | |||
==Summary== | ==Summary== | ||
Line 13: | Line 12: | ||
The plant comprises one line via standard combustion B&W Volund proprietary Dynagrate technology, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability up to 85,000 tonnes per annum and generating 7.25MWe based on [[CV]] of 9MJ/kg <ref>[http://www.volund.dk/Waste_to_Energy/References/Peterborough_UK Volund Website]</ref>. | The plant comprises one line via standard combustion B&W Volund proprietary Dynagrate technology, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability up to 85,000 tonnes per annum and generating 7.25MWe based on [[CV]] of 9MJ/kg <ref>[http://www.volund.dk/Waste_to_Energy/References/Peterborough_UK Volund Website]</ref>. | ||
= | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{# | {{EAIn|EPR={{#var: epr}}}} | ||
{| | |||
==References== | ==References== | ||
<references /> | <references /> |
Latest revision as of 19:11, 18 June 2021
An EfW facility based upon conventional combustion technology which is considered an ERF as a result of having R1 status. Peterborough has permitted operational capacity of 85,000 tonnes per annum, operated and owned by Viridor. Delivery of waste is by road and the facility processes primarily residual Household Waste [1].
Peterborough EfW Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | NP3638ZS |
Operator | Viridor |
Region | Eastern |
Operational Capacity | 110ktpa |
Is site R1? | fal |
When was R1 Granted? | 2015-03-11 |
What was the R1 value | 0.80 |
Electrical Capacity | 7.30MWe |
Number of Lines | 1 |
Number of Turbines | 1 |
CHP | No |
Technology Approach | EfW |
Funding Type | PPP |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 84454.35 | 0.00 | 0.00 | 0.00 | 84454.35 |
2017 | 81248.32 | 0.00 | 0.00 | 0.00 | 81248.32 |
2018 | 55686.61 | 27994.07 | 0.00 | 0.00 | 83680.68 |
2019 | 48061.00 | 32221.00 | 1824.00 | 0.00 | 82106.00 |
2020 | 53262.00 | 28051.00 | 4659.00 | 0.00 | 85972.00 |
2021 | 57899.00 | 21507.00 | 4913.00 | 0.00 | 84319.00 |
2022 | 60425.27 | 21906.47 | 7862.50 | 0.00 | 90938.67 |
2023 | 51132.00 | 18927.00 | 9846.00 | 5413.00 | 86093.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 19200.64 | 22.73% | 1948.30 | 2.31% |
2017 | 17968.81 | 22.12% | 2204.04 | 2.71% |
2018 | 17384.77 | 20.78% | 2139.04 | 2.56% |
2019 | 17602.00 | 21.44% | 2390.00 | 2.91% |
2020 | 17708.00 | 20.60% | 2224.00 | 2.59% |
2021 | 17697.00 | 20.99% | 1828.00 | 2.17% |
2022 | 19541.13 | 21.49% | 1934.65 | 2.13% |
2023 | 17916.57 | 20.81% | 1746.06 | 2.03% |
Summary
An EfW facility based upon conventional combustion technology which is considered an ERF as a result of having R1 status. Peterborough has permitted operational capacity of 85,000 tonnes per annum, operated and owned by Viridor. Delivery of waste is by road and the facility processes primarily residual Household Waste [2].
History
The Peterborough facility was built to primarily service residual Household Waste from Peterborough under a 30 year PPP contract. It is located close to Peterborough Power Station in Fengate, and commenced operation in December 2015.
Plant
Built by a JV between Interserve and Babcox & Wilcox Volund A/S as a turnkey EPC contract, which started in summer 2013 and was delivered in December 2015 at a reported [3] £74m capital cost. The plant comprises one line via standard combustion B&W Volund proprietary Dynagrate technology, generating super-heated steam, and is configured to run on primarily residual Household Waste and similar residual Commercial Waste with design capability up to 85,000 tonnes per annum and generating 7.25MWe based on CV of 9MJ/kg [4].
Local Authority Data
The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on Error: no local variable "updated" has been set.. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 0t
A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:
- no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
- a result of the plant being recently commissioned and actually having received no tonnage or
- a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
- it may be a new plant being in 'ramp up' towards full capacity after construction or
- may be a result of plant shut down and subsequent re-start in a year or
- the local authority may not have correctly entered the site's details on WasteDataFlow
Authority | Tonnage |
---|
Waste Tonnage, By Origin
The table shows a list of the Waste for the Permit NP3638ZS, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated on October 2024. The total reported tonnage arriving at the site was: 86,093.15t.
Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:
- Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
- Material may have been received into the site but treated in some other way than incineration.
- Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code | Origin of Waste | Tonnes In |
---|---|---|
20 03 01 | Cambridge | 6458.36 |
20 01 39 | Cambridgeshire | 359.98 |
19 12 12 | West Midlands | 184.42 |
20 03 01 | London | 128.40 |
20 03 01 | Lincolnshire | 880.96 |
20 03 01 | Cambridgeshire | 47917.80 |
19 12 12 | Bedford | 672.82 |
20 03 03 | Cambridgeshire | 414.95 |
20 03 01 | Rutland | 218.18 |
20 03 01 | Northamptonshire | 12512.79 |
18 01 04 | Cambridgeshire | 9845.69 |
20 03 07 | Cambridgeshire | 1943.43 |
19 12 12 | Cambridgeshire | 4555.37 |