[[Category:Biomass EfW Plants]] | [[Goosey Lodge Power Plant]] is a [[Biomass Waste EFW]] generating 16MWe to the grid. It is located in Wymington near Rushton in Northamptonshire. | ||
{{BiomassPlant|NAME=Goosey Lodge|id=38}} | [[Category:Biomass EfW Plants]]{{#vardefine: epr|NP3338SZ}} | ||
{{BiomassPlant|NAME=Goosey Lodge Power Plant|id=38|EPR={{#var: epr}}}} | |||
[[File:Goosey Lodge.jpg|400px|left|Goosey Lodge]]<ref name="GOO">[http://www.ancillarycomponents.co.uk/wykinc.html/ Ancillary Components]All Rights Reserved</ref>__TOC__ | |||
<br clear="left"/> | |||
==Summary== | ==Summary== | ||
Goosey Lodge is a | [[Goosey Lodge Power Plant]] is a [[Biomass Waste EFW]] generating 16MWe to the grid. It is located in Wymington near Rushton in Northamptonshire. The plant is able to process a wide range of feedstock including solid and liquid [[Animal By-product Material]] and [[Wood Waste]] and has a permitted tonnage threshold of up to 438,000 tonnes per annum<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/614334/Variation_notice.pdf/ Permit Variation Notice], EA</ref>. | ||
The plant is owned by [[Ancillary Components Ltd]]. | |||
==Plant== | ==Plant== | ||
Goosey Lodge biomass facility utilises two fluidised bed | Goosey Lodge biomass facility utilises two bubbling [[fluidised bed combustion systems]] which ensures that any liquids and sludges with high [[Biological or Chemical Oxygen Demand]] (BOD and COD respectively) can be oxidised efficiently<ref name ="GOO" />. Each fluidised bed incinerator has a capacity of up to 25 tonnes per hour equating to a maximum throughput of 438,000 tonnes per annum<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/614334/Variation_notice.pdf/ Permit Variation Notice], EA</ref>. | ||
Goosey Lodge Power Plant was designed and built by [[Wykes Engineering]], the group's Engineering Company. Wykes provided a turnkey solution to the project which included design to manufacture and full life cycle maintenance and project management<ref name ="GOO" />. | |||
{{BioSustain|EPR={{#var: epr}}}} | |||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== |
Latest revision as of 07:15, 15 August 2022
Goosey Lodge Power Plant is a Biomass Waste EFW generating 16MWe to the grid. It is located in Wymington near Rushton in Northamptonshire.
Goosey Lodge Power Plant Operational | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Ancillary Components Ltd |
Capacity | 16 MWe |
Feedstock | MBM/Other |
EPR (Waste Licence) | NP3338SZ |
ROC | Yes |
CfD | |
CHP | Unkwn |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|---|---|---|---|---|
2018 | 0 | 0 | 0 | 0 | 156983 |
2019 | 0 | 0 | 0 | 0 | 146748 |
2020 | 0 | 0 | 0 | 0 | 147503 |
2021 | 0 | 0 | 0 | 0 | 147503 |
2022 | 22152 | 0 | 0 | 130652 | 152804 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2018 | 20680 | 13.17% | 0 | 0.00% |
2019 | 16603 | 11.31% | 0 | 0.00% |
2020 | 1663 | 1.13% | 0 | 0.00% |
2021 | 23203 | 15.73% | 0 | 0.00% |
2022 | 23733 | 15.53% | 0 | 0.00% |
Summary
Goosey Lodge Power Plant is a Biomass Waste EFW generating 16MWe to the grid. It is located in Wymington near Rushton in Northamptonshire. The plant is able to process a wide range of feedstock including solid and liquid Animal By-product Material and Wood Waste and has a permitted tonnage threshold of up to 438,000 tonnes per annum[2].
The plant is owned by Ancillary Components Ltd.
Plant
Goosey Lodge biomass facility utilises two bubbling fluidised bed combustion systems which ensures that any liquids and sludges with high Biological or Chemical Oxygen Demand (BOD and COD respectively) can be oxidised efficiently[1]. Each fluidised bed incinerator has a capacity of up to 25 tonnes per hour equating to a maximum throughput of 438,000 tonnes per annum[3].
Goosey Lodge Power Plant was designed and built by Wykes Engineering, the group's Engineering Company. Wykes provided a turnkey solution to the project which included design to manufacture and full life cycle maintenance and project management[1].
Annual Sustainability Tonnage Input/Fuel
The tonnage[4] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[5]:
Year | Waste Wood (m3) | Waste Wood (t) | Straw | Miscanthus | Arboricultrual Waste | Sawmill Residue | Foresrty Residue | Round Wood | Short Rotation Coppice | MBM | Other Material |
---|---|---|---|---|---|---|---|---|---|---|---|
2020/21 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 64446 | 80833 |
2019/20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 65695 | 82416 |
2018/19 | 0 | 3774 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 62407 | 81610 |
2017/18 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='NP3338SZ' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected
Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='NP3338SZ' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).
Waste Tonnage, By Origin
The table shows a list of the Waste for the Permit NP3338SZ, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.
Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:
- Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
- Material may have been received into the site but treated in some other way than incineration.
- Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code | Origin of Waste | Tonnes In |
---|
References
- ↑ 1.0 1.1 1.2 Ancillary ComponentsAll Rights Reserved
- ↑ Permit Variation Notice, EA
- ↑ Permit Variation Notice, EA
- ↑ In the case of EfW plants with gasification technology the figures are reported in terms of cubic metres of syngas produced rather than tonnes used
- ↑ Biomass Sustainability Dataset 2020-21