Lancing EfW: Difference between revisions
m minor text changes |
No edit summary |
||
| (5 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
[[File:Lancing.png|400px|left|Rabbit's Lancing Transfer and EFW in background (from Google Street View May 2017)]] | Also known as Enviropower and Lancing Biomass Plant, [[Lancing EfW]] is is an [[EfW]] facility based upon conventional combustion technology which is not considered an [[ERF]] as a result of not having [[R1]] status. [[Lancing EfW]] has permitted operational capacity of up to 75,000 tonnes per annum, and is owned and operated by [[Enviropower Ltd]] | ||
[[Category:EfW Plants]][[Category:Biomass EfW Plants]]{{#vardefine:epr|XP3030XX}} | |||
{{EfWTemplate|EPR={{#var: epr}}|id=41}} | |||
[[File:Lancing.png|400px|left|Rabbit's Lancing Transfer and EFW in background (from Google Street View May 2017)]]__TOC__<br clear='left' /> | |||
==Summary== | ==Summary== | ||
Also known as Enviropower, and Lancing Biomass Plant, [[Lancing EfW]] is an [[EfW]] facility based upon conventional combustion technology which is not considered an [[ERF]] as a result of not having [[R1]] status. [[Lancing EfW]] has permitted operational capacity of up to 75,000 tonnes per annum, and is owned and operated by [[Enviropower Ltd]], a subsidiary of [[Rabbit Group]]. Delivery of waste is from the adjacent [[Rabbit]] transfer station which prepares the [[Waste Derived Fuel]] for the plant comprising a [[Wood Waste]] /[[Biomass]] rich [[RDF]] and as a result is listed both within the [[Residual Waste EFW]] and [[Biomass Waste EFW]] listings. | |||
==History== | ==History== | ||
| Line 10: | Line 11: | ||
==Plant== | ==Plant== | ||
The plant comprises standard combustion, on 2 lines of Talbot | The plant comprises standard combustion, on 2 lines of Talbot [[Grate]]s, generating super-heated steam, generating up to 5MWe for export to the national grid. | ||
= | {{BioSustain|EPR={{#var: epr}}}} | ||
The | |||
The [[Wood Waste]] is received from a variety of sources, all of which is processed in the adjacent [[WTS|transfer station]] prior to use in the Enviropower site. | |||
{{ | |||
{{EfWLAData|EPR={{#var: epr}}}} | |||
{{EAIn|EPR={{#var: epr}}}} | |||
{{ | |||
} | |||
==References== | ==References== | ||
<references /> | <references /> | ||