Walpole Recovery Facility and Landfill Site: Difference between revisions

Bin52 (talk | contribs)
Bin52 (talk | contribs)
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{NHLFTemp|Permit=BK6785IE|id=107}}__TOC__
{{NHLFTemp|Permit=BK6785IE|id=107}}__TOC__
[[Category:Non-Haz Landfill]]
[[Category:Non-Haz Landfill]][[Category:Non-Haz Landfill with SNRHW Cell]]
==Summary==
==Summary==
[[Dimmer Landfill Site]] was developed from 1970 onwards, initially by Wincanton Rural District Council and then from 1974 onwards by [[Somerset County Council]]. The [[Landfill]] site came to be operated by [[Viridor]] following the sale of [[Wyvern Waste Services Limited]] to Viridor in 2006. Dimmer was one of two operational sites that passed to Viridor at that time. The most recent parts of the site are operated to [[Landfill Directive]] compliant standards.
It is understood that some of the permitted capacity may not be filled for commercial reasons.


==History==
==History==
Line 10: Line 7:
==Title==
==Title==


==Tonnage Handled==
Only Waste Codes receiving over 5,000t are shown.
{{NHLFTable|Permit=BK6785IE}}
{{NHLFTable|Permit=BK6785IE}}


==References==
==References==
<references />
<references />