[[File:Chineham ERF.jpg|280px|left|Chineham ERF. Veolia, 2020]]
{{#vardefine:epr|BJ7786IV}}[[Category:EfW Plants]]
[[Category:EfW Plants]]
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Chineham ERF, also known as Integra North, is located at the site of an old incinerator in a rural area near the town of Basingstoke in the north of Hampshire. The facility has a permitted operational capacity of 102,000 tonnes per annum, exporting up to 8 MW electricity to the national grid after the plants own power needs are supplied for<ref name="ref1">Veolia, 2006. [https://www.veolia.co.uk/hampshire/sites/g/files/dvc1796/files/document/2014/10/Chineham.pdf Recovering Resources for All - Integra North Energy Recovery Facility. Online. Veolia Environmental Services. [Accessed 10 Feb. 2020].] </ref>.
{{EfWTemplate|EPR=BJ7786IV|id=36}}
{{EfWTemplate|EPR={{#var:epr}}|id=36}}[[File:Chineham ERF.jpg|280px|left|Chineham ERF. Veolia, 2020]]__TOC__<br clear='left' />


==Summary==
==Summary==
Line 7: Line 7:


The plant is owned and operated by [[Veolia]]. The waste feedstock utilized at the plant is primarily residual waste arising from residents of the North Hampshire Districts  
The plant is owned and operated by [[Veolia]]. The waste feedstock utilized at the plant is primarily residual waste arising from residents of the North Hampshire Districts  
==History==
==History==
This facility has been developed and continues to be managed under the 28-year Public Private Partnership contract with [[Hampshire County Council]], [[Southampton City Council]] and [[Portsmouth City Council]]<ref name="ref2">Veolia, 2020. [https://www.veolia.co.uk/hampshire/energy-recovery/chineham Chineham. Online. Veolia Hampshire. [Accessed 10 Feb. 2020].]</ref>.  
This facility has been developed and continues to be managed under the 28-year Public Private Partnership contract with [[Hampshire County Council]], [[Southampton City Council]] and [[Portsmouth City Council]]<ref name="ref2">Veolia, 2020. [https://www.veolia.co.uk/hampshire/energy-recovery/chineham Chineham. Online. Veolia Hampshire. [Accessed 10 Feb. 2020].]</ref>.  
Line 14: Line 13:


In June 2019, a fire broke out at the facility which [[Veolia]] later confirmed had occurred during routine maintenance work at the site. Parts of the plant were seriously damaged by the fire, the cladding around the plant and the roof received fire damage from the incident<ref name="ref3" />.
In June 2019, a fire broke out at the facility which [[Veolia]] later confirmed had occurred during routine maintenance work at the site. Parts of the plant were seriously damaged by the fire, the cladding around the plant and the roof received fire damage from the incident<ref name="ref3" />.
==Plant==
==Plant==
The combustion technology is the Martin GmbH reverse acting grate with a single line<ref>Martin GmbH, 2012. [http://www.martinbiopower.com/files/9514/1101/0098/Thermal_waste_treatment_facilities_using_MARTIN_technologies.pdf Thermal waste treatment facilities using MARTIN technologies. Online. [Accessed 11 Feb. 2020].]</ref>. The [[EPC]] contractor to build the plant was [[CNIM]], [[CNIM]] also supplied the semi-dry lime scrubber for treatment of the flue gas which is followed by high performance bag filters, discharging into a 65 metre high chimney<ref name="ref1" />.
The combustion technology is the Martin GmbH reverse acting grate with a single line<ref>Martin GmbH, 2012. [http://www.martinbiopower.com/files/9514/1101/0098/Thermal_waste_treatment_facilities_using_MARTIN_technologies.pdf Thermal waste treatment facilities using MARTIN technologies. Online. [Accessed 11 Feb. 2020].]</ref>. The [[EPC]] contractor to build the plant was [[CNIM]], [[CNIM]] also supplied the semi-dry lime scrubber for treatment of the flue gas which is followed by high performance bag filters, discharging into a 65 metre high chimney<ref name="ref1" />.
Line 22: Line 20:
[[Project Integra]] is a unique partnership between [[Hampshire County Council]], the two Unitary Authorities of Southampton and Portsmouth, the 11 District Councils and [[Veolia]] Environmental Services.
[[Project Integra]] is a unique partnership between [[Hampshire County Council]], the two Unitary Authorities of Southampton and Portsmouth, the 11 District Councils and [[Veolia]] Environmental Services.


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EAIn|EPR={{#var: epr}}}}
{{#clear_external_data:}}
 
{{#get_db_data: db=engy
|from=wdfincin|where=epr='BJ7786IV'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />

Latest revision as of 19:10, 18 June 2021

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Chineham ERF, also known as Integra North, is located at the site of an old incinerator in a rural area near the town of Basingstoke in the north of Hampshire. The facility has a permitted operational capacity of 102,000 tonnes per annum, exporting up to 8 MW electricity to the national grid after the plants own power needs are supplied for[1].


Chineham ERF (Integra North)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence BJ7786IV
Operator Veolia
Region South East
Operational Capacity 110ktpa
Is site R1? fal
When was R1 Granted? 2017-10-03
What was the R1 value 0.00
Electrical Capacity 8.00MWe
Number of Lines 1
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 97997.00 0.00 0.00 0.00 97997.00
2017 93374.00 0.00 0.00 0.00 93374.00
2018 71466.00 21711.00 0.00 0.00 93177.00
2019 67827.00 26323.00 0.00 0.00 94150.00
2020 78457.00 20948.00 330.00 0.00 99735.00
2021 80849.00 25843.00 159.00 0.00 106851.00
2022 67511.00 28367.00 20.00 0.00 95898.00
2023 76702.00 28190.00 0.00 0.00 104892.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 16723.00 17.06% 2847.00 2.91%
2017 16013.00 17.15% 2573.00 2.76%
2018 16100.00 17.28% 2637.00 2.83%
2019 15611.00 16.58% 2705.00 2.87%
2020 16133.00 16.18% 2694.00 2.70%
2021 17477.00 16.36% 2637.00 2.47%
2022 15311.00 15.97% 2344.00 2.44%
2023 19257.00 18.36% 2438.00 2.32%

Chineham ERF. Veolia, 2020
Chineham ERF. Veolia, 2020


Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Chineham ERF, also known as Integra North, is located at the site of an old incinerator in a rural area near the town of Basingstoke in the north of Hampshire. The facility has a permitted operational capacity of 102,000 tonnes per annum, exporting up to 8 MW electricity to the national grid after the plants own power needs are supplied for[1].

The plant is owned and operated by Veolia. The waste feedstock utilized at the plant is primarily residual waste arising from residents of the North Hampshire Districts

History

This facility has been developed and continues to be managed under the 28-year Public Private Partnership contract with Hampshire County Council, Southampton City Council and Portsmouth City Council[2].

The facility began full operations in November 2003[3].

In June 2019, a fire broke out at the facility which Veolia later confirmed had occurred during routine maintenance work at the site. Parts of the plant were seriously damaged by the fire, the cladding around the plant and the roof received fire damage from the incident[3].

Plant

The combustion technology is the Martin GmbH reverse acting grate with a single line[4]. The EPC contractor to build the plant was CNIM, CNIM also supplied the semi-dry lime scrubber for treatment of the flue gas which is followed by high performance bag filters, discharging into a 65 metre high chimney[1].

When the plant was being designed, there was a focus on making the development as unobtrusive to its surroundings as possible as architects led the designing stage with the use of special materials, light reactive cladding, and a significant landscaping scheme[2].

Project Integra is a unique partnership between Hampshire County Council, the two Unitary Authorities of Southampton and Portsmouth, the 11 District Councils and Veolia Environmental Services.

Local Authority Data

The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on 2023-04-26. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 56,957.53t

A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:

  • no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
  • a result of the plant being recently commissioned and actually having received no tonnage or
  • a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
  • it may be a new plant being in 'ramp up' towards full capacity after construction or
  • may be a result of plant shut down and subsequent re-start in a year or
  • the local authority may not have correctly entered the site's details on WasteDataFlow


Authority Tonnage
Hampshire County Council 56718.950
Swindon Borough Council 96.304
West Berkshire District Council 142.280

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit BJ7786IV, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated on October 2024. The total reported tonnage arriving at the site was: 104,466.11t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In
20 01 08 Leicestershire 134.18
20 03 01 Swindon 32.50
20 03 01 Oxfordshire 120.42
20 01 08 Crawley 80.52
19 12 12 West Berkshire 219.34
20 01 08 Southampton 72.64
20 03 01 Reading 95.74
19 12 12 Basingstoke and Deane 1574.92
20 03 01 Wiltshire 9.90
02 03 04 Hart 0.24
20 03 01 West Berkshire 230.46
20 03 01 Hampshire 26512.80
20 03 01 Berkshire 89.90
20 03 01 Basingstoke and Deane 67102.81
20 01 99 Hampshire 24.62
20 01 08 Harborough 413.22
20 01 08 Basingstoke and Deane 15.56
20 03 01 Hart 323.42
20 03 01 Winchester 3.08
20 03 01 Rushmoor 6570.62
20 03 01 Woking 3.80
15 01 06 Basingstoke and Deane 2.66
20 03 07 Basingstoke and Deane 0.48
20 03 01 Oxford 86.70
20 03 03 Basingstoke and Deane 722.82
20 01 08 East Midlands 21.64
02 03 04 Hampshire 1.12


References