Parc Adfer EfW: Difference between revisions

Bin52 (talk | contribs)
m minor text change
Bin52 (talk | contribs)
mNo edit summary
 
(5 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[File:Parc Adfer EfW.jpg|400px|left|Parc Adfer EfW. Wheelabrator, 2020.]]
{{#vardefine:epr|AB3092CV}}[[Category:EfW Plants]]
[[Category:EfW Plants]]
The Parc Adfer Energy from Waste facility was developed by and is operated by [[Wheelabrator]], located at the Deeside Industrial Park in Flintshire, North Wales. The facility accepts 200,000 tonnes per year (although an application has been made to extend the permit to 232,000 tonnes) of residual waste as a feedstock from household, business and commercial sources, and produces both electricity and heat through a combustion system as a [[CHP]] plant. The waste feedstock is locally supplied by the 5 counties in the North of Wales representing the [[North Wales Residual Waste Treatment Project]]<ref name= "ref1"> Wheelabrator, 2020. [https://wtiparcadfer.co.uk/about-us/ About - Parc Adfer. Online. Wheelabrator Parc Adfer. [Accessed 6 Feb. 2020]]</ref>.{{EfWTemplate|EPR={{#var: epr}}|id=55}}[[File:Parc Adfer EfW.jpg|400px|left|Parc Adfer EfW. Wheelabrator, 2020.]]__TOC__<br clear='left' />
{{EfWTemplate|EPR=Tbc#09|id=55}}


==Summary==
==Summary==
Line 16: Line 15:
The project financing was £180 million which was supplied with a 23-year term loan from the Green Investment Bank, MUFG, Natixis and Siemens, with an equity bridging loan provided by Barclays<ref name="ref1" />.
The project financing was £180 million which was supplied with a 23-year term loan from the Green Investment Bank, MUFG, Natixis and Siemens, with an equity bridging loan provided by Barclays<ref name="ref1" />.


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EAIn|EPR={{#var: epr}}}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='Tbc#09'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />