An [[EfW]] facility based upon conventional [[combustion]] technology that reached operational handover in June 2023. [[Newhurst EFW]] has a permitted capacity of 455,000 tonnes per annum.{{EfWTemplate|EPR={{#var:epr}}|id=73}}[[File:Newhurst efw artist image.png|350px|left|Newhurst EFW Artist Image - source Encyclis Website, all rights reserved]]__TOC__<br clear='left'/>
[[Category:EfW Plants]]
{{EfWTemplate|EPR=Tbc#28|id=73}}
 


==Summary==
==Summary==
An [[EfW]] facility based upon conventional [[combustion]] technology that reached financial close in February 2020. [[Newhurst EFW]] has a permitted capacity of 350,000 tonnes per annum. The project is being developed by [[Covanta]] who will be the operator of the facility when constructed. The facility is 50% owned by [[Covanta]] and [[Macquarie]]'s [[Green Investment Group]] and 50% by [[Biffa]]<ref>[https://www.circularonline.co.uk/news/financial-close-achieved-on-newhurst-energy-from-waste-plant/ Circular Magazine Article]</ref>.
An [[EfW]] facility based upon conventional [[combustion]] technology that reached financial close in February 2020 and operational handover in June 2023. [[Newhurst EFW]] has a permitted capacity of 455,000 tonnes per annum. The project was developed by [[Covanta]], now known as [[Encyclis]] who are also the operator of the facility. The facility was 50% owned by [[Covanta]] and [[Macquarie]]'s [[Green Investment Group]] and 50% by [[Biffa]]<ref>[https://www.circularonline.co.uk/news/financial-close-achieved-on-newhurst-energy-from-waste-plant/ Circular Magazine Article]</ref>. In March 2022 [[EQT]], the owner of Covanta, bought the interests of the [[Green Investment Group]] in this and three other projects ([[Rookery Pit Energy Recovery Facility (Rookery South)]], [[Protos EFW]], and [[Earls Gate Energy Centre]]) to leave [[Green Investment Group]] with no further interest in the projects<ref>https://www.endswasteandbioenergy.com/article/1748321/covanta-buys-gig-stakes-four-efw-plants</ref>.
In June 2025 [[Biffa]] sold their 50% interest to [[Encyclis]] to give them complete control<ref>https://www.encyclis.com/news/encyclis-and-biffa-advance-sustainable-waste-infrastructure-with-transition-of-energy-recovery-facilities-to-encyclis-full-ownership/</ref>.


==Technology==
==Technology==
The plant technology will comprise standard moving [[grate]] technology, producing super-heated steam, generating 42MWe.  
The plant technology comprises standard moving [[grate]] technology by [[Hitachi Zosen Inova]], producing super-heated steam, generating 42MWe.  


==Construction==
==Construction==
The plant reached financial close in February 2020 and will delivered under a turnkey [[EPC]] arrangement with [[Hitachi Zosen Inova]] technology over a 39 month programme with technical oversight by [[Covanta]]<ref>[https://www.covanta.com/News/Press-Releases/2020/02/Feb-11 Covanta Website]</ref><ref>[https://www.letsrecycle.com/news/latest-news/hzi-claims-highest-efficiency-newhurst-efw/ Letsrecycle Article]</ref>.  
The plant was delivered under a turnkey [[EPC]] arrangement with [[Hitachi Zosen Inova]] technology over a 3 year programme with technical oversight by [[Covanta]]<ref>[https://www.covanta.com/News/Press-Releases/2020/02/Feb-11 Covanta Website]</ref><ref>[https://www.letsrecycle.com/news/latest-news/hzi-claims-highest-efficiency-newhurst-efw/ Letsrecycle Article]</ref>. In October 2022 it was reported that hot commissioning had commenced with the intention to move to full operations in May 2023<ref>https://www.letsrecycle.com/news/newhurst-reaches-hot-commissioning/</ref> and [[Encyclis]] reported operational handover occurred in June 2023<ref>https://www.newhursterf.co.uk/</ref>.


==Waste Input==
==Waste Input==
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]] with 70% provided from [[Biffa]]'s existing local waste collection services.
The plant is intended to run on primarily on residual [[Household Waste]] from the contract between [[Biffa]] and [[Leicestershire County Council]] and [[Commercial Waste]] provided from [[Biffa]]'s existing local waste collection services.