[[ | {{#vardefine:epr|KP3236HW}}[[Category:EfW Plants]] | ||
[[ | An integrated [[EfW]] facility with other treatment technology, with the [[EfW]] based upon [[Gasification]] technology and not considered an [[ERF]] based on not having [[R1]] status. [[Sinfin Lane]] has permitted operational capacity of 190,000 tonnes per annum, although the [[EfW]] element of the facility is thought to be slightly less than this. It was developed by [[Resource Recovery Solutions]], a subsidiary of [[Renewi]], although it is reported that the contract has been terminated and a new operating partner is being sought<ref>[https://www.letsrecycle.com/news/latest-news/derbyshire-councils-prepare-for-end-of-sinfin-contract/ Letsrecycle Article]</ref> with the current site MOTHBALLED.{{EfWTemplate|EPR={{#var:epr}}|id=29}}[[File:Sinfin Lane.png|350px|left|Sinfin Lane - Derbyshire]]__TOC__<br clear='left' /> | ||
{{EfWTemplate|EPR= | |||
==Summary== | ==Summary== | ||
An integrated [[EfW]] facility with other treatment technology, with the [[EfW]] based upon [[Gasification]] technology and not considered an [[ERF]] based on not having [[R1]] status. [[Sinfin Lane]] has permitted operational capacity of 190,000 tonnes per annum, although the [[EfW]] element of the facility is thought to be slightly less than this. It was developed by [[Resource Recovery Solutions]], a subsidiary of [[Renewi]], although it is reported that the contract has been terminated and a new operating partner is being sought<ref>[https://www.letsrecycle.com/news/latest-news/derbyshire-councils-prepare-for-end-of-sinfin-contract/ Letsrecycle Article]</ref> with the current site MOTHBALLED. | An integrated [[EfW]] facility with other treatment technology, with the [[EfW]] based upon [[Gasification]] technology and not considered an [[ERF]] based on not having [[R1]] status. [[Sinfin Lane]] has permitted operational capacity of 190,000 tonnes per annum, although the [[EfW]] element of the facility is thought to be slightly less than this. It was developed by [[Resource Recovery Solutions]], a subsidiary of [[Renewi]], although it is reported that the contract has been terminated and a new operating partner is being sought<ref>[https://www.letsrecycle.com/news/latest-news/derbyshire-councils-prepare-for-end-of-sinfin-contract/ Letsrecycle Article]</ref> with the current site MOTHBALLED. | ||
| Line 12: | Line 10: | ||
Originally built by [[Interserve]] under an [[EPC]] contract which started in 2014 (with a 2017 completion date) with the [[Gasification]] technology delivered by [[Energos]], the contract was delayed through commissioning and the [[MBT]] plant suffered complaints of odour. Originally estimated to cost £145m as a joint venture between [[Interserve]] and [[Renewi]] and funded by the [[Green Investment Bank]]<ref>[https://www.interserve.com/news-media/press-releases/press-release/2014/08/21/interserve-shanks-joint-venture-to-finance-build-and-operate-new-waste-treatment-centre-in-derby Interserve Press release]</ref>. Due to the accumulated losses by [[Interserve]] on this project and the [[Glasgow Renewable Energy and Recycling Centre (ACT| Glasgow]] project led to [[Interserve]] exiting the [[EfW]] market in early 2017<ref>[https://www.letsrecycle.com/news/latest-news/interserve-to-be-investigated-over-efw-exit/ Letsrecycle Article]</ref> | Originally built by [[Interserve]] under an [[EPC]] contract which started in 2014 (with a 2017 completion date) with the [[Gasification]] technology delivered by [[Energos]], the contract was delayed through commissioning and the [[MBT]] plant suffered complaints of odour. Originally estimated to cost £145m as a joint venture between [[Interserve]] and [[Renewi]] and funded by the [[Green Investment Bank]]<ref>[https://www.interserve.com/news-media/press-releases/press-release/2014/08/21/interserve-shanks-joint-venture-to-finance-build-and-operate-new-waste-treatment-centre-in-derby Interserve Press release]</ref>. Due to the accumulated losses by [[Interserve]] on this project and the [[Glasgow Renewable Energy and Recycling Centre (ACT| Glasgow]] project led to [[Interserve]] exiting the [[EfW]] market in early 2017<ref>[https://www.letsrecycle.com/news/latest-news/interserve-to-be-investigated-over-efw-exit/ Letsrecycle Article]</ref> | ||