Stoke-on-Trent EfW: Difference between revisions

Bin52 (talk | contribs)
m minor text change
No edit summary
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{#vardefine: epr|QP3234SX}}
{{#vardefine: epr|HP3341QV}}
[[Category:EfW Plants]]
[[Category:EfW Plants]]
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Stoke has permitted operational capacity of 210,000 tonnes per annum.
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Stoke has permitted operational capacity of 210,000 tonnes per annum.
{{EfWTemplate|EPR={{#var: epr}}|id=25}}
{{EfWTemplate|EPR={{#var: epr}}|id=25}}
[[File:Stoke on Trent.png|300px|left|Stoke-on-Trent EFW]]__TOC__
[[File:Stoke on Trent.png|300px|left|Stoke-on-Trent EFW]]__TOC__<br clear='left'/>
<br clear='left'/>
 
==Summary==
==Summary==
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Stoke has permitted operational capacity of 210,000 tonnes per annum. The facility is operated by [[MES Environmental]], now part of [[Paprec]], having agreed to buy out [[CNIM]] in March 2021<ref>[https://cnim.com/sites/default/files/media/Communiqu%C3%A9s%20financiers/2021-03-25-CNIM-Communiqu%C3%A9-EN.pdf CNIM Press Release]</ref>. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] <ref>[https://www.mesenvironmental.co.uk/index.php/operations/stoke/ MSES Website]</ref>.
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Stoke has permitted operational capacity of 210,000 tonnes per annum. The facility is operated by [[MES Environmental]], now part of [[Paprec]], having agreed to buy out [[CNIM]] in March 2021<ref>[https://cnim.com/sites/default/files/media/Communiqu%C3%A9s%20financiers/2021-03-25-CNIM-Communiqu%C3%A9-EN.pdf CNIM Press Release]</ref>. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] <ref>[https://www.mesenvironmental.co.uk/index.php/operations/stoke/ MSES Website]</ref>.
Line 15: Line 13:
The plant comprises two lines via standard [[combustion]] [[CNIM]] boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 12.5 tonnes per hour or up to 205,000 tonnes per annum and generating 15 MWe.
The plant comprises two lines via standard [[combustion]] [[CNIM]] boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 12.5 tonnes per hour or up to 205,000 tonnes per annum and generating 15 MWe.


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
{{EfWLAData|EPR={{#var: epr}}}}
 
{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />