Cornwall ERC: Difference between revisions
Arctellion (talk | contribs) Update to new format |
Arctellion (talk | contribs) No edit summary |
||
Line 14: | Line 14: | ||
The plant comprises 2 lines via standard combustion technology, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] generating 16.6MWe of power <ref>[https://vinci-construction.com/en/expertises/cornwall-energy-recovery-center-cornwall-united-kingdom/227/ Vinci Website]</ref>. | The plant comprises 2 lines via standard combustion technology, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] generating 16.6MWe of power <ref>[https://vinci-construction.com/en/expertises/cornwall-energy-recovery-center-cornwall-united-kingdom/227/ Vinci Website]</ref>. | ||
= | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{# | {{EAIn|EPR={{#var: epr}}}} | ||
{| | |||
==References== | ==References== | ||
<references /> | <references /> |
Latest revision as of 19:00, 18 June 2021
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Cornwall has permitted operational capacity of 249,000 tonnes per annum, operated and owned by Cornwall Energy Recovery Ltd, owned by Pensions Infrastructure Platform, i-Environment Investments and Suez with the latter operating the facility. Delivery of waste is by road and the facility processes primarily residual Household Waste and some Commercial Waste[1]
Cornwall ERC Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | GP3433GH |
Operator | SUEZ |
Region | South West |
Operational Capacity | 240ktpa |
Is site R1? | fal |
When was R1 Granted? | 2020-02-03 |
What was the R1 value | 0.76 |
Electrical Capacity | 24.00MWe |
Number of Lines | 2 |
Number of Turbines | 1 |
CHP | No |
Technology Approach | EfW |
Funding Type | PFI |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2017 | 35830.10 | 0.00 | 12.08 | 151587.25 | 187429.43 |
2018 | 41681.71 | 0.00 | 223.36 | 179672.34 | 221577.41 |
2019 | 153899.00 | 89357.00 | 20.00 | 0.00 | 243276.00 |
2020 | 162489.00 | 82086.00 | 0.00 | 0.00 | 244575.00 |
2021 | 168449.00 | 78777.00 | 0.00 | 0.00 | 247226.00 |
2022 | 154896.00 | 90780.00 | 0.00 | 0.00 | 245676.00 |
2023 | 156149.00 | 87302.00 | 0.00 | 0.00 | 243451.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 0.00 | 0.00% | 0.00 | 0.00% |
2017 | 44012.64 | 23.48% | 4447.50 | 2.37% |
2018 | 41677.54 | 18.81% | 5705.32 | 2.57% |
2019 | 45524.00 | 18.71% | 6200.00 | 2.55% |
2020 | 47909.00 | 19.59% | 5613.00 | 2.30% |
2021 | 47041.00 | 19.03% | 5716.00 | 2.31% |
2022 | 43011.00 | 17.51% | 5092.00 | 2.07% |
2023 | 38473.00 | 15.80% | 5030.00 | 2.07% |
Summary
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Cornwall has permitted operational capacity of 249,000 tonnes per annum, operated and owned by Cornwall Energy Recovery Ltd, owned by Pensions Infrastructure Platform, i-Environment Investments and Suez with the latter operating the facility. Delivery of waste is by road and the facility processes primarily residual Household Waste and some Commercial Waste[2]
History
The Cornwall facility was built as part of a PFI contract with Cornwall Council which runs to 2039 and includes the operation of HWRC sites and MRFs in the county. The tonnage provided requires a large proportion of tonnage to be sourced from outside Cornwall, which has proved controversial[3]. It is located on the outskirts of St. Dennis and has been operational since March 2017[4].
Plant
Built by Vinci Environment UK (a 50/50 subsidiary of Vinci Construction UK and Vinci Environment) under a Design & Build-turnkey contract, construction was completed in March 2018 at a reported[5] £141m capital cost. The plant comprises 2 lines via standard combustion technology, generating super-heated steam, and is configured to run on primarily residual Household Waste and similar residual Commercial Waste generating 16.6MWe of power [6].
Local Authority Data
The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on Error: no local variable "updated" has been set.. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 0t
A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:
- no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
- a result of the plant being recently commissioned and actually having received no tonnage or
- a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
- it may be a new plant being in 'ramp up' towards full capacity after construction or
- may be a result of plant shut down and subsequent re-start in a year or
- the local authority may not have correctly entered the site's details on WasteDataFlow
Authority | Tonnage |
---|
Waste Tonnage, By Origin
The table shows a list of the Waste for the Permit GP3433GH, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated on October 2024. The total reported tonnage arriving at the site was: 243,715.66t.
Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:
- Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
- Material may have been received into the site but treated in some other way than incineration.
- Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code | Origin of Waste | Tonnes In |
---|---|---|
19 12 12 | Somerset | 87.78 |
20 03 01 | Dorset | 5545.68 |
19 12 12 | Devon | 15031.92 |
19 12 12 | Dorset | 1197.56 |
19 12 12 | Bristol, City of | 1634.84 |
20 03 01 | Devon | 4029.14 |
19 12 12 | Cornwall | 40375.86 |
20 03 01 | Bristol, City of | 352.84 |
19 12 10 | Devon | 46.86 |
20 03 01 | Cornwall | 133970.94 |
19 12 10 | Cornwall | 15287.16 |
19 12 12 | East Devon | 10559.78 |
20 03 01 | North Devon | 15595.30 |