NESS Energy Project: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{#vardefine:epr|Tbc#26}}[[Category:EfW Plants]]
{{#vardefine:epr|PPC/A/1186430}}[[Category:EfW Plants]]
An [[EfW]] facility based upon conventional [[combustion]] technology, located at East Tullos industrial estate at the site of a former gas storage site in the south of Aberdeen. The facility is forecast to have a capacity of 150,000 tonnes per annum and will export electricity to the national grid.{{EfWTemplate|EPR={{#var:epr}}|id=151}}[[File:Ness Energy Project.jpg|270px|left|Ness Energy Project. Lets Recycle, 2019.]]__TOC__<br clear='left' />
An [[EfW]] facility based upon conventional [[combustion]] technology, located at East Tullos industrial estate at the site of a former gas storage site in the south of Aberdeen. The facility is forecast to have a capacity of 150,000 tonnes per annum and will export electricity to the national grid.{{EfWTemplate|EPR={{#var:epr}}|id=151}}[[File:Ness Energy Project.jpg|270px|left|Ness Energy Project. Lets Recycle, 2019.]]__TOC__<br clear='left' />


Line 8: Line 8:


==Technology==
==Technology==
The [[EfW]] will utilize moving-[[grate]] [[combustion]] technology<ref name="ref1" /> from [[KeppelSeghers]]<ref>[http://www.nessenergy.co.uk/news/dialogue-begins-four-bidders.aspx NESS Website]</ref>.
The [[EfW]] will utilize moving-[[grate]] [[combustion]] technology<ref>https://www.standardkessel-baumgarte.com/en/references/efw-anlage-in-aberdeen-grossbritannien</ref> from [[Standardkessel Baumgarte]]<ref>[http://www.nessenergy.co.uk/news/dialogue-begins-four-bidders.aspx NESS Website]</ref>.


==Construction==
==Construction==