Millerhill EfW: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
 
(2 intermediate revisions by the same user not shown)
Line 14: Line 14:


==Plant==
==Plant==
FCC Environment appointed [[Hitachi Zosen Inova]] (HZI)<ref>[https://www.hz-inova.com/projects/edinburgh-efw/ Hitachi Zosen Inova Website]</ref> and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility.
FCC Environment appointed [[Hitachi Zosen Inova]] (HZI)<ref>[https://www.kanadevia-inova.com/projects/edinburgh-WtE/ PDF Fact Sheet accessed 26th Feb 2025]</ref> and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility.
 
{{EfWLAData|EPR={{#var: epr}}}}


==Local Authority Data==
The [[Residual EfW]] pages for sites located in England and Wales capture the data reported by Local Authorities, through [[WasteDataFlow]], received at those sites. In Scotland this data is not reported, meaning that the destination in [[WasteDataFlow]] is not defined and the origin in the regulator returns for a facility receiving the tonnage is also not reported (resulting in a 'NA' in the table in the section below). As a result it is not possible to report for Scottish sites in the same way as other sites in WikiWaste.
{{EAIn|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}


==References==
==References==
<references />
<references />