Rookery Pit Energy Recovery Facility (Rookery South): Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
links and ownership updates
Bin52 (talk | contribs)
No edit summary
 
Line 9: Line 9:


==Construction==
==Construction==
The plant gained planning consent in 2013, reached financial close in March 2019, and will delivered by an [[EPC]] turnkey arrangement with [[Hitachi Zosen Inova]] technology. An operational date is programmed for 2022 after a lengthy legal challenge to the development came to an end in November 2019 focused on the issue of the [[Environmental Permit]] <ref>[https://www.letsrecycle.com/news/latest-news/court-rejects-rookery-pit-appeal/ Letsrecycle Article]</ref>.
The plant gained planning consent in 2013, reached financial close in March 2019, and will delivered by an [[EPC]] turnkey arrangement with [[Hitachi Zosen Inova]] technology. An operational date is programmed for 2022 after a lengthy legal challenge to the development came to an end in November 2019 focused on the issue of the [[Environmental Permit]] <ref>[https://www.letsrecycle.com/news/latest-news/court-rejects-rookery-pit-appeal/ Letsrecycle Article]</ref>. The plant was handed over as operational in January 2022<ref>https://www.covanta.com/news/press-releases/covanta-starts-operating-the-rookery-south-energy-recovery-facility-on-schedule</ref>.


==Waste Input==
==Waste Input==

Latest revision as of 11:44, 25 July 2022

An EfW facility based upon conventional combustion technology and presently in early stage construction. Rookery Pit Energy Recovery Facility (Rookery South) has a permitted capacity of 585,000 tonnes per annum. The project is being developed by Covanta and is was owned by Covanta (80%), Veolia (20%) and Covanta and Green Investment Group (80%). In March 2022 EQT, the owner of Covanta, bought the interests of the Green Investment Group[1].


Rookery Pit Energy Recovery Facility (Rookery South)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence WP3234DY
Operator Encyclis
Region Eastern
Operational Capacity 585ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.80
Electrical Capacity 65.00MWe
Number of Lines 3
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type Merchant

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2019 0.00 0.00 0.00 0.00 0.00
2020 0.00 0.00 0.00 0.00 0.00
2021 0.00 0.00 0.00 0.00 0.00
2022 497768.00 0.00 0.00 0.00 497768.00
2023 593692.00 0.00 0.00 0.00 593692.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2019 0.00 0.00% 0.00 0.00%
2020 0.00 0.00% 0.00 0.00%
2021 0.00 0.00% 0.00 0.00%
2022 94906.00 19.07% 11618.00 2.33%
2023 118195.00 19.91% 13930.00 2.35%

Rookery South Energy Recovery Facility under construction in December 2020 - Rookery South Newsletter, all rights reserved
Rookery South Energy Recovery Facility under construction in December 2020 - Rookery South Newsletter, all rights reserved


Summary

An EfW facility based upon conventional combustion technology and presently in early stage construction. Rookery Pit ERF has a permitted capacity of 585,000 tonnes per annum. The project is being developed by Covanta and was owned by Covanta (80%), Veolia (20%) and Covanta and Green Investment Group (80%). In March 2022 EQT, the owner of Covanta, bought the interests of the Green Investment Group in this and three other projects (Newhurst EFW, Protos EFW, and Earls Gate Energy Centre)[1] to leave Green Investment Group with no further interest in the projects.

Technology

The plant technology will comprise standard moving grate technology, producing super-heated steam with an operational capacity of 545,000 tonnes per annum, generating and 60MWe [2].

Construction

The plant gained planning consent in 2013, reached financial close in March 2019, and will delivered by an EPC turnkey arrangement with Hitachi Zosen Inova technology. An operational date is programmed for 2022 after a lengthy legal challenge to the development came to an end in November 2019 focused on the issue of the Environmental Permit [3]. The plant was handed over as operational in January 2022[4].

Waste Input

The plant is intended to run on residual Household Waste and Commercial Waste provided by Veolia.

References