Bywaters Recycling And Recovery Centre: Difference between revisions

No edit summary
Bin52 (talk | contribs)
m add categories
 
(10 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{#vardefine:epr|80744}}{{#vardefine:id|1}}
[[Category:Qualifying MRFs]]
[[Bywaters Recycling And Recovery Centre]] was built in 2008 and is one of the largest [[Material Recovery Facility|"Clean" MRFs]] in the UK handling [[DMR]] materials and is classified as a [[Qualifying MRF]] under the [[MRF Code of Practice]].
{{#vardefine:epr|80744}}{{#vardefine:id|32}}
{{MRFSidebar|EPR={{#var:epr}}|id={{#var:id}}}}
{{MRFSidebar|EPR={{#var:epr}}|id={{#var:id}}}}
[[File:Bywtaers MRFv2.png|300px|left|Bywaters MRF picture from website, all rights reserved]]__TOC__
<br clear='left'/>
==Summary==
==Summary==
[[Bywaters Recycling And Recovery Centre]] was built in 2008 and is one of the largest [[Material Recovery Facility|"Clean" MRFs]] in the UK handling [[DMR]] materials and is classified as a [[Qualifying MRF]] under the [[MRF Code of Practice]].
==History==
==History==
The [[Bywaters]] business is a family owned business that can trace its origins back to 1918. The [[Bywaters Recycling And Recovery Centre]] was built as part of a requirement to relocate as a result of the development of the [[wikipedia: Queen Elizabeth Olympic Park |Olympic Park]] for the 2012 Olympics<ref>https://www.bywaters.co.uk/about/heritage</ref>.
==Plant==
==Plant==
{{EAIn|EPR={{#var:epr}}}}
The plant was supplied by [[Eggersmann Anlagenbau GmbH]] and is capable of processing c.18 tonnes of [[DMR]] material per hour, or c.140,000 tonnes per annum of [[DMR]] material.
{{MRFEAIn|Permit={{#var:epr}}}}
{{MRFEAOut|Permit={{#var:epr}}}}
{{QualIN|EPR={{#var:epr}}}}
{{QualIN|EPR={{#var:epr}}}}
{{QualOUT|EPR={{#var:epr}}}}
{{QualOUT|EPR={{#var:epr}}}}
==References==
==References==
<references />
<references />