Bywaters Recycling And Recovery Centre: Difference between revisions
No edit summary |
m add categories |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
[[Bywaters Recycling And Recovery Centre]] was built in | [[Category:Qualifying MRFs]] | ||
[[Bywaters Recycling And Recovery Centre]] was built in 2008 and is one of the largest [[Material Recovery Facility|"Clean" MRFs]] in the UK handling [[DMR]] materials and is classified as a [[Qualifying MRF]] under the [[MRF Code of Practice]]. | |||
{{#vardefine:epr|80744}}{{#vardefine:id|32}} | {{#vardefine:epr|80744}}{{#vardefine:id|32}} | ||
{{MRFSidebar|EPR={{#var:epr}}|id={{#var:id}}}} | {{MRFSidebar|EPR={{#var:epr}}|id={{#var:id}}}} | ||
Line 5: | Line 6: | ||
<br clear='left'/> | <br clear='left'/> | ||
==Summary== | ==Summary== | ||
[[Bywaters Recycling And Recovery Centre]] was built in | [[Bywaters Recycling And Recovery Centre]] was built in 2008 and is one of the largest [[Material Recovery Facility|"Clean" MRFs]] in the UK handling [[DMR]] materials and is classified as a [[Qualifying MRF]] under the [[MRF Code of Practice]]. | ||
==History== | ==History== | ||
The [[Bywaters]] business is a family owned business that can trace its origins back to | The [[Bywaters]] business is a family owned business that can trace its origins back to 1918. The [[Bywaters Recycling And Recovery Centre]] was built as part of a requirement to relocate as a result of the development of the [[wikipedia: Queen Elizabeth Olympic Park |Olympic Park]] for the 2012 Olympics<ref>https://www.bywaters.co.uk/about/heritage</ref>. | ||
==Plant== | ==Plant== | ||
The plant was supplied by [[ | The plant was supplied by [[Eggersmann Anlagenbau GmbH]] and is capable of processing c.18 tonnes of [[DMR]] material per hour, or c.140,000 tonnes per annum of [[DMR]] material. | ||
{{MRFEAIn|Permit={{#var:epr}}}} | {{MRFEAIn|Permit={{#var:epr}}}} | ||
{{MRFEAOut|Permit={{#var:epr}}}} | {{MRFEAOut|Permit={{#var:epr}}}} |