Brigg REP: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
A [[Biomass Waste EFW]] facility [[Brigg REP]] processes up to 250,000 tonnes per year of a range of [[Biomass]], but primarily straw and a limited amount of [[Wood Waste]] to generate up to 40MWe for export to the national grid<ref>[https://www.briggbiomass.com/brigg-renewable-energy-plant/ Brigg website]</ref>.
[[Category:Biomass EfW Plants]]{{#vardefine: epr|EP3133DQ}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|EP3133DQ}}
{{BiomassPlant|NAME=Brigg |id=16|EPR={{#var: epr}}}}
{{BiomassPlant|NAME=Brigg REP |id=16|EPR={{#var: epr}}}}
[[File:Brigg-picture.png|400px|left|Brigg Biomass EFW - source cipartners.dk]]__TOC__
[[File:Brigg-picture.png|400px|left|Brigg Biomass EFW - source cipartners.dk]]__TOC__
<br clear='left'/>
<br clear='left'/>
Line 6: Line 7:


==Summary==
==Summary==
A [[Biomass Waste EFW]] facility processing up to 250,000 tonnes per year of a range of [[Biomass]], but primarily straw and a limited amount of [[Wood Waste]] to generate up to 40MWe for export to the national grid<ref>[https://www.briggbiomass.com/brigg-renewable-energy-plant/ Brigg website]</ref>. The straw fuel is supplied under a 12 year agreement with [[Worldwide Farming Partnership]] (WFP) as well as other local and regional farmers.
A [[Biomass Waste EFW]] facility [[Brigg REP]] processes up to 250,000 tonnes per year of a range of [[Biomass]], but primarily straw and a limited amount of [[Wood Waste]] to generate up to 40MWe for export to the national grid<ref>[https://www.briggbiomass.com/brigg-renewable-energy-plant/ Brigg website]</ref>. The straw fuel is supplied under a 12 year agreement with [[Worldwide Farming Partnership]] (WFP) as well as other local and regional farmers.


The plant was originally jointly owned by [[Burmeister & Wain Scandinavian Contractor A/S]] (BWSC) and [[Copenhagen Infrastructure Partners K/S]] (CIP), with senior debt refinancing completed in 2017 of £250m (including [[Royal Bank of Scotland]], [[Investec]], [[Aviva Investors]] and others) but in April 2021 it was confirmed that Octopus Renewables had bought the facility from the joint investors for an undisclosed fee<ref>ENDS April 2021</ref>.
The plant was originally jointly owned by [[Burmeister & Wain Scandinavian Contractor A/S]] (BWSC) and [[Copenhagen Infrastructure Partners K/S]] (CIP), with senior debt refinancing completed in 2017 of £250m (including [[Royal Bank of Scotland]], [[Investec]], [[Aviva Investors]] and others) but in April 2021 it was confirmed that Octopus Renewables had bought the facility from the joint investors for an undisclosed fee<ref>ENDS April 2021</ref>.
Line 13: Line 14:
Built under an [[EPC]] contract with [[Burmeister & Wain Scandinavian Contractor A/S]] (BWSC), construction commenced in early 2014 and commissioning and first power was delivered at the end of 2015 and formal opening in January 2016.  
Built under an [[EPC]] contract with [[Burmeister & Wain Scandinavian Contractor A/S]] (BWSC), construction commenced in early 2014 and commissioning and first power was delivered at the end of 2015 and formal opening in January 2016.  


==Tonnage Input/Fuel==
{{BioSustain|EPR={{#var: epr}}}}
The tonnage received by the plant is a mixture of [[Biomass]] and in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> [[Ofgem]] reported the following fuel received ([[Wood Waste]] representing 8% of input):
{{EAIn|EPR={{#var: epr}}}}
{| class="wikitable"
|-
! Biomass !! Tonnage (2018-19)
|-
| [[Wood Waste]] || '''15,239'''
|-
| Straw  || 132,339
|-
| Miscanthus || 23,755
|-
| Sawmill Residues || 2,308
|-
| Arboriculture and Forestry Residues || 19,638
|-
| Short Rotation Coppice|| 3,835
|-
| Other (Olive Pellets) || 4,968
|-
| Total||202,082
|}
The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) although no waste tonnage was recorded by the site in the waste returns.


==References==
==References==
<references />
<references />

Latest revision as of 06:52, 15 August 2022

A Biomass Waste EFW facility Brigg REP processes up to 250,000 tonnes per year of a range of Biomass, but primarily straw and a limited amount of Wood Waste to generate up to 40MWe for export to the national grid[1].


Brigg REP
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Burmeister & Wain Scandinavian Contractor (BWSC)
Capacity 40 MWe
Feedstock Straw/Virgin
EPR (Waste Licence) EP3133DQ
ROC Yes
CfD
CHP Yes

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Brigg Biomass EFW - source cipartners.dk
Brigg Biomass EFW - source cipartners.dk


[2]

Summary

A Biomass Waste EFW facility Brigg REP processes up to 250,000 tonnes per year of a range of Biomass, but primarily straw and a limited amount of Wood Waste to generate up to 40MWe for export to the national grid[3]. The straw fuel is supplied under a 12 year agreement with Worldwide Farming Partnership (WFP) as well as other local and regional farmers.

The plant was originally jointly owned by Burmeister & Wain Scandinavian Contractor A/S (BWSC) and Copenhagen Infrastructure Partners K/S (CIP), with senior debt refinancing completed in 2017 of £250m (including Royal Bank of Scotland, Investec, Aviva Investors and others) but in April 2021 it was confirmed that Octopus Renewables had bought the facility from the joint investors for an undisclosed fee[4].

Plant

Built under an EPC contract with Burmeister & Wain Scandinavian Contractor A/S (BWSC), construction commenced in early 2014 and commissioning and first power was delivered at the end of 2015 and formal opening in January 2016.

Annual Sustainability Tonnage Input/Fuel

The tonnage[5] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[6]:

Year Waste Wood (m3) Waste Wood (t) Straw Miscanthus Arboricultrual Waste Sawmill Residue Foresrty Residue Round Wood Short Rotation Coppice MBM Other Material
2020/21 0 0 167335 30978 4041 0 9128 0 593 0 260
2019/20 214 0 215524 23179 108 0 14561 0 466 0 6971
2018/19 0 15240 0 23755 0 2309 19638 0 3835 0 4968
2017/18 0 0 0 0 0 0 0 0 0 0 0

The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='EP3133DQ' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected

Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='EP3133DQ' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit EP3133DQ, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In


References

  1. Brigg website
  2. Brigg Biomass EfW Site PhotoAll Rights Reserved
  3. Brigg website
  4. ENDS April 2021
  5. In the case of EfW plants with gasification technology the figures are reported in terms of cubic metres of syngas produced rather than tonnes used
  6. Biomass Sustainability Dataset 2020-21