Welland Bio Power: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
[[Category:Biomass EfW Plants]]{{#vardefine: epr|AP3432QC}}
A [[Biomass EfW]] facility, [[Welland Bio Power]] is based on processing up to 72,000 tonnes per annum of [[Wood Waste]] producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020]].</ref>.
{{BiomassPlant|NAME=Welland Bio Power Ltd|id=89|EPR={{#var: epr}}}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|FP3701LZ}}
[[File:Welland Bio Power.png|400px|left|Welland Bio Power. CoGen, 2018.]]__TOC__
{{BiomassPlant|NAME=Welland Bio Power|id=89|EPR={{#var: epr}}}}
[[File:Welland Bio Power.png|400px|left|Welland Bio Power. CoGen, 2018.]]<ref>[https://www.cogenuk.com/projects/ Welland Bio Power Site Photo]All Rights Reserved</ref>__TOC__
<br clear='left'/>
<br clear='left'/>
<ref>[https://www.cogenuk.com/projects/ Welland Bio Power Site Photo]All Rights Reserved</ref>


==Summary==
==Summary==
A [[Biomass EfW]] facility, Welland Bio Power is based on processing up to 72,000 tonnes per annum of [[Wood Waste]] producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020]].</ref>.
A [[Biomass EfW]] facility, [[Welland Bio Power]] is based on processing up to 72,000 tonnes per annum of [[Wood Waste]] producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1"/>.


The facility is located near Theddingworth in Northamptonshire. The [[Wood Waste]] feedstock is sourced locally through a contract with [[Welland Waste Management]]’s adjacent waste timber processing facility<ref name="ref1"/>.
The facility is located near Theddingworth in Northamptonshire. The [[Wood Waste]] feedstock is sourced locally through a contract with [[Welland Waste Management]]’s adjacent waste timber processing facility<ref name="ref1"/>.


Welland Bio Power is operated by [[Nexterra]] and was developed by [[CoGen]] in partnership with [[Welland Waste Management]]. [[CoGen]] continues to provide management services<ref name="ref1"/>.
Welland Bio Power is operated by [[Welland Operations Ltd]] and was developed by [[CoGen]] in partnership with [[Welland Waste Management]]<ref name="ref1"/>.


==Plant==
==Plant==
Line 18: Line 18:


The facility replicates its sister project [[Birmingham Bio Power]].
The facility replicates its sister project [[Birmingham Bio Power]].
 
{{BioSustain|EPR={{#var: epr}}}}
==Tonnage Input/Fuel==
{{EAIn|EPR={{#var: epr}}}}
The tonnage received by the plant is reported as [[Wood Waste]] in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref>. Because the plant is an [[Advanced Conversion Technology]] and produces a [[Syngas]] the sustainability report talks in terms of the gas input to the energy recovery system, rather than the unprocessed [[Wood Waste]] into the plant, which was 305,783,697 cubic meters.
The [[Wood Waste]] is exclusively supplied by [[Welland Waste Management]] which sources much of the [[Wood Waste]] from [[Waste Disposal Authorities]].  
The [[Wood Waste]] is exclusively supplied by [[Welland Waste Management]] which sources much of the [[Wood Waste]] from [[Waste Disposal Authorities]]. The [[Wood Waste]] tonnage received and recorded in the [[EA]] statistics for the calendar year (i.e. January 2018 to December 2018) was '''9,190''' tonnes.  


==References==
==References==
<references/>
<references/>

Latest revision as of 15:38, 10 September 2024

A Biomass EfW facility, Welland Bio Power is based on processing up to 72,000 tonnes per annum of Wood Waste producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met[1].


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Welland Bio Power. CoGen, 2018.
Welland Bio Power. CoGen, 2018.

[2]


Summary

A Biomass EfW facility, Welland Bio Power is based on processing up to 72,000 tonnes per annum of Wood Waste producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met[1].

The facility is located near Theddingworth in Northamptonshire. The Wood Waste feedstock is sourced locally through a contract with Welland Waste Management’s adjacent waste timber processing facility[1].

Welland Bio Power is operated by Welland Operations Ltd and was developed by CoGen in partnership with Welland Waste Management[1].

Plant

The facility utilises Nexterra’s fixed-bed updraft gasification system technology, which is an Advanced Conversion Technology. MWH Treatment provided EPC services for the project[3].

The facility cost £51.6 million to develop and was financed by Balfour Beatty Investments, NOY Nexterra Holdings Limited Partnership (a partnership between NOY Infrastructure Fund and Nexterra) and Equitix MA Infrastructure Fund[3].

The facility replicates its sister project Birmingham Bio Power.

Annual Sustainability Tonnage Input/Fuel

The tonnage[4] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for Error: no local variable "asyear" has been set. was reported by Ofgem as below[5]:

Year Waste Wood (m3) Waste Wood (t) Straw Miscanthus Arboricultrual Waste Sawmill Residue Foresrty Residue Round Wood Short Rotation Coppice MBM Other Material

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit FP3701LZ, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated on October 2024. The total reported tonnage arriving at the site was: 67,718.25t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In
19 12 07 Leicestershire 67718.25


The Wood Waste is exclusively supplied by Welland Waste Management which sources much of the Wood Waste from Waste Disposal Authorities.