==Plant==
==Plant==
The facility entered into operation in May 2017 with [[BWSC]] chosen as the [[EPC]] contractor for the project. The boiler was supplied by [[Standardkessel GmbH]] and the technology is a standard pusher-type [[grate]] technology<ref>[https://www.standardkessel-baumgarte.com/en/news/news-details.html?newsid=443/ Standard Kessel GmbH]</ref>.
The facility entered into operation in May 2017 with [[BWSC]] chosen as the [[EPC]] contractor for the project. The boiler was supplied by [[Standardkessel GmbH]] and the technology is a standard pusher-type [[grate]] technology<ref>https://www.standardkessel-baumgarte.com/fileadmin/redakteur/Referenzblaetter/REFERENCE_SHEET_WIDNES_a.pdf</ref>.