Stoke-on-Trent EfW: Difference between revisions
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
{{#vardefine: epr| | {{#vardefine: epr|HP3341QV}} | ||
[[Category:EfW Plants]] | [[Category:EfW Plants]] | ||
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Stoke has permitted operational capacity of 210,000 tonnes per annum. | An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Stoke has permitted operational capacity of 210,000 tonnes per annum. | ||