Dudley EfW: Difference between revisions
No edit summary |
No edit summary |
||
| (7 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
{{#vardefine: epr|HP3247QS}} | {{#vardefine: epr|HP3247QS}} | ||
[[Category:EfW Plants]] | [[Category:EfW Plants]] | ||
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Dudley has permitted operational capacity of 105,000 tonnes per annum. | An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Dudley has permitted operational capacity of 105,000 tonnes per annum. | ||
| Line 8: | Line 7: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. The facility | An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. The facility was operated by [[MES Environmental]], part of [[Paprec]], having agreed to buy out [[CNIM]] in March 2021<ref>[https://cnim.com/sites/default/files/media/Communiqu%C3%A9s%20financiers/2021-03-25-CNIM-Communiqu%C3%A9-EN.pdf CNIM Press Release]</ref>. In early 2024 a contract was awarded <ref>https://councilnews.dudley.gov.uk/news/new-contract-could-save-the-council-up-to-gbp-2million-a-year</ref> for the operation of the facility to [[Urbaser]] (which was subsequently acquired by [[FCC]]). Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] <ref>[https://www.mesenvironmental.co.uk/index.php/operations/dudley/ MSES Website]</ref>. | ||
==History== | ==History== | ||
| Line 16: | Line 15: | ||
The plant comprises two lines via standard [[combustion]] [[CNIM]] boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 6 tonnes per hour or up to 99,000 tonnes per annum and generating 7 MWe. | The plant comprises two lines via standard [[combustion]] [[CNIM]] boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 6 tonnes per hour or up to 99,000 tonnes per annum and generating 7 MWe. | ||
{{EfWLAData|EPR={{#var: | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: | {{EAIn|EPR={{#var: epr}}}} | ||
==References== | ==References== | ||
<references /> | <references /> | ||