Residual Waste EFW: Difference between revisions

Bin52 (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
 
(10 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{#clear_external_data:}}
{{#clear_external_data:}}
{{#get_db_data: db=engy|from=efwdb | where=status='Operational' | data=opt=sum(cap)}}
{{#get_db_data: db=mnk |from=optot | data=opt=op_tot}}
{{#vardefine: opston | {{#external_value:opt}}}}
{{#vardefine: opston | {{#external_value:opt}}}}
{{#clear_external_data:}}
{{#clear_external_data:}}
{{#get_db_data: db=engy|from=efwdb | where=status='Under Construction' | data=opt=sum(cap)}}
{{#get_db_data: db=mnk |from=uctot | data=opt=uc_tot}}
{{#vardefine: ucston | {{#external_value:opt}}}}
{{#vardefine: ucston | {{#external_value:opt}}}}
{{#clear_external_data:}}
{{#clear_external_data:}}
{{#get_db_data: db=engy|from=efwdb | where=status='Planning' | data=opt=sum(cap)}}
{{#get_db_data: db=mnk |from=pltot | data=opt=pl_tot}}
{{#vardefine: planton | {{#external_value:opt}}}}
{{#vardefine: planton | {{#external_value:opt}}}}
{{#clear_external_data:}}
{{#clear_external_data:}}
{{#get_db_data: db=engy|from=efwdb | where=status='Consultation Stage' | data=opt=sum(cap)}}
{{#get_db_data: db=mnk |from=contot | data=opt=con_tot}}
{{#vardefine: conston | {{#external_value:opt}}}}
{{#vardefine: conston | {{#external_value:opt}}}}


Line 17: Line 17:
[[File:Ferrybridge 2.png|400px|left|Ferrybridge 2 (with Ferrybridge 1 in background) - which will be the largest 'single site' for Residual Waste EFW in the UK when both are fully operational]]__TOC__
[[File:Ferrybridge 2.png|400px|left|Ferrybridge 2 (with Ferrybridge 1 in background) - which will be the largest 'single site' for Residual Waste EFW in the UK when both are fully operational]]__TOC__
<br clear='left'/>
<br clear='left'/>
==Operational EfW==
==Operational EfW==  
The following list summarises all [[EfW]] sites that were operational as of March 2022, with limited summary information in the table. More detailed information can be found by clicking through to the site-specific page, the total 'plated capacity' is '''{{formatnum: {{#var:opston}}}} kt''':
The following list summarises all [[EfW]] sites that were operational as of March 2022, with limited summary information in the table. More detailed information can be found by clicking through to the site-specific page, the total 'plated capacity' is '''{{formatnum: {{#var:opston}}}} kt''':
[[File:Location of EfWs in UK.png|600px|right|Locations of Operational residual waste EfWs in the UK]]
[[File:Location of EfWs in UK.png|600px|right|Locations of Operational residual waste EfWs in the UK]]
{{#clear_external_data:}}
{{#clear_external_data:}}


{{#get_db_data: db=mnk |from=energy.efwdb |where=status='Operational' and length(epr) > 2|data=site=site,id=id,cap=cap|order by=id}}
{{#get_db_data: db=mnk |from=opsite |data=site=site,id=id,cap=cap,tech=tech}}
{|Class="wikitable sortable"
{|Class="wikitable sortable"
! ID !! Site Name !! Capacity (kt)
! ID !! Site Name !! Technology !! Capacity (kt)
{{#for_external_table:<nowiki/>
{{#for_external_table:<nowiki/>
{{!}}-
{{!}}-
{{!}} {{{id}}}.
{{!}} {{{id}}}.
{{!}} [[{{{site}}}]]
{{!}} [[{{{site}}}]]
{{!}} [[{{{tech}}}]]
{{!}} {{{cap}}}
{{!}} {{{cap}}}
}}
}}
|}
|}
Technology: EfW - EfW [[Incineration]]; ACT - [[Advanced Conversion Technology]]; WtF - [[Waste to Fuel]].
Summary site information is collated from a variety of sources including: Monksleigh<ref name="monk">[http://www.monksleigh.com Monksleigh Ltd]</ref>, Tolvik<ref name="tolv">[https://www.tolvik.com Tolvik]</ref>, [[EA]], [[SEPA]], [[NRW]], [[DEFRA]], [[BEIS]], [[UKWIN]] and owner and developer websites</small>.
Summary site information is collated from a variety of sources including: Monksleigh<ref name="monk">[http://www.monksleigh.com Monksleigh Ltd]</ref>, Tolvik<ref name="tolv">[https://www.tolvik.com Tolvik]</ref>, [[EA]], [[SEPA]], [[NRW]], [[DEFRA]], [[BEIS]], [[UKWIN]] and owner and developer websites</small>.


Line 43: Line 46:
Historically, the UK has been very dependent on [[Landfill]] or [[Incineration without Energy Recovery]] for [[Disposal]] of [[Residual Waste]]. The landfill diversion targets set in the mid 1990s promoted [[EfW]] developments. The diversion of residual waste away from [[Landfill]] and into [[EfW]] processes was intended to reduce emissions of methane and pollution originating from [[Landfill]] sites and increase production of renewable energy<ref name="foo" />. [[Energy from Waste]] is the now the main method for dealing with [[Residual Waste]], with [[Landfill]] of [[Residual Waste]] being the least preferred method, as outlined in the [[Waste Hierarchy]]<ref name="foo" />.
Historically, the UK has been very dependent on [[Landfill]] or [[Incineration without Energy Recovery]] for [[Disposal]] of [[Residual Waste]]. The landfill diversion targets set in the mid 1990s promoted [[EfW]] developments. The diversion of residual waste away from [[Landfill]] and into [[EfW]] processes was intended to reduce emissions of methane and pollution originating from [[Landfill]] sites and increase production of renewable energy<ref name="foo" />. [[Energy from Waste]] is the now the main method for dealing with [[Residual Waste]], with [[Landfill]] of [[Residual Waste]] being the least preferred method, as outlined in the [[Waste Hierarchy]]<ref name="foo" />.


In 2022, the amount of residual waste that was sent to [[EfW]] processes in the UK increased by 2.6%, amounting to a total of 15.32 kt being sent to 57 operational EfW facilities across the UK<ref name="foo2> [https://www.tolvik.com/published-reports/view/uk-energy-from-waste-statistics-2022// Derived from Tolvik EFW Statistics 2022, Published May 2023]</ref>. This was against a headline/plated capacity of 17.52 kt of operational capacity and a further 5.72 kt of late stage commissioning and in construction 'plated' capacity at that time. This represented 76.3% of [[Local Authority Collected Waste]] with the balance from [[Commercial and Industrial Waste]]<ref name="foo2" />. The total net power exported from [[EfW]] facilities in 2022 was 9,428 GWh, this supplied 3.2% of the total UK power generation, and gives an average of 620 kWh of power generated per tonne of residual waste treated at UK [[EfW]] facilities<ref name="foo2" />.
In 2024, the amount of residual waste that was sent to [[EfW]] processes in the UK increased by 4.3%, amounting to a total of 16.8 kt being sent to 63 operational EfW facilities across the UK<ref name="foo2> [https://www.tolvik.com/published-reports/view/uk-energy-from-waste-statistics-2023// Derived from Tolvik EFW Statistics 2024, Published April 2025]</ref>. This was against a headline/plated capacity of 19.34 kt of operational capacity and a further 4.85 kt of late stage commissioning and in construction 'plated' capacity at that time. This represented 74.4% of [[Local Authority Collected Waste]] with the balance from [[Commercial and Industrial Waste]]<ref name="foo2" />. The total net power exported from [[EfW]] facilities in 2024 was 10,040 GWh, this supplied 3.6% of the total UK power generation, and gives an average of 600 kWh of power generated per tonne of residual waste treated at UK [[EfW]] facilities<ref name="foo2" />.
The graph below displays how the tonnage of residual waste processes by UK [[EfW]] facilities has changed over recent years, and is based on that received rather than the 'plated' capacity of the plants in operation and construction (23.24 kt reported by Tolvik<ref name="foo2" /> at the end of 2022, whereas this page reports '''{{formatnum: {{#expr: {{#var: opston}} + {{#var: ucston}}}}}} kt''' as at March 2021).
The graph below displays how the tonnage of residual waste processes by UK [[EfW]] facilities has changed over recent years, and is based on that received rather than the 'plated' capacity of the plants in operation and construction (24.16 kt reported by Tolvik<ref name="foo2" /> at the end of 2024, whereas this page reports '''{{formatnum: {{#expr: {{#var: opston}} + {{#var: ucston}}}}}} kt''' as at March 2021).
 
{|style="margin: auto;"
{|style="margin: auto;"
|+style="caption-side:bottom;"|Changes in residual waste tonnage processed by [[EfW]]s<ref name="foo2" />
|+style="caption-side:bottom;"|Changes in residual waste tonnage processed by [[EfW]]s<ref name="foo2" />
|-
|-
| <graph>{
| [[File:EFW Graph.png|center|frameless|649x649px]]
    "width":400,
    "height":200,
    "data":[{
        "name":"table",
        "values":[
            {"x":2006,"y":3.3},{"x":2007,"y":3.3},{"x":2008,"y":3.3},
            {"x":2009,"y":3.6},{"x":2010,"y":4.2},{"x":2011,"y":4.8},
            {"x":2012,"y":5.2},{"x":2013,"y":5.5},{"x":2014,"y":6.7},
            {"x":2015,"y":8.4},{"x":2016,"y":10.1},{"x":2017,"y":10.9},
            {"x":2018,"y":11.5},{"x":2019,"y":12.6},{"x":2020,"y":14.0},
{"x":2021,"y":14.9}, {"x":2022,"y":15.3}
            ]
    }],
    "scales": [
    {
      "name": "x",
      "type": "linear",
      "range": "width",
      "zero": false,
      "domain": {"data": "table", "field": "x"}
    },
    {
      "name": "y",
      "type": "linear",
      "range": "height",
      "nice": true,
      "domain": {"data": "table", "field": "y"}
    }
    ],
    "axes": [
        {"type": "x", "scale": "x", "format":"d","title":"Year"},
        {"type": "y", "scale": "y", "grid":true, "title":"Million Tonnes"}
    ],
    "marks": [
    {
      "type": "line",
      "from": {"data": "table"},
      "properties": {
        "enter": {
          "x": {"scale": "x", "field": "x"},
          "y": {"scale": "y", "field": "y"},
          "stroke": {"value": "steelblue"},
          "strokeWidth":{"value":2}
        }
      }
    },
    {
      "type": "symbol",
      "from": {"data": "table"},
      "properties": {
        "enter": {
          "x": {"scale":"x","field": "x"},
          "y": {"scale":"y","field": "y"},
          "fill": {"value": "steelblue"},
          "size":{"value":15}
            }
        }
    }
  ]
}</graph>
|-
|-
|}
{|class="wikitable" style="margin: auto;"
{|class="wikitable" style="margin: auto;"
|-
|-
|+Table Summarizing Graph Data
|+Table Summarizing Graph Data
|'''Year''' || 2006 || 2007 || 2008 || 2009 || 2010 || 2011 || 2012 || 2013 || 2014 || 2015 || 2016 || 2017 || 2018||2019||2020||2021||2022
|'''Year''' || 2006 || 2007 || 2008 || 2009 || 2010 || 2011 || 2012 || 2013 || 2014 || 2015 || 2016 || 2017 || 2018||2019||2020||2021||2022||2023||2024
|-
|-
|'''Million Tonnes''' || 3.3 || 3.3 || 3.3 || 3.6 || 4.2 || 4.8 || 5.2 || 5.5 || 6.7 || 8.4 || 10.1 || 10.9 || 11.5||12.6||14.1||14.9||15.3
|'''Million Tonnes''' || 3.3 || 3.3 || 3.3 || 3.6 || 4.2 || 4.8 || 5.2 || 5.5 || 6.7 || 8.4 || 10.1 || 10.9 || 11.5||12.6||14.1||14.9||15.3||16.1||16.8
|}
|}
|}




The table below shows the power and heat generation from residual waste EfW facilities in the UK between 2014-2021.<ref name="foo2" />
The table below shows the power and heat generation from residual waste EfW facilities in the UK between 2014-2024.<ref name="foo2" />
{|class="wikitable" style="margin: auto;"
{|class="wikitable" style="margin: auto;"
|-
|-
|+Power and Heat Table
|+Power and Heat Table
|'''Year''' || 2014 || 2015 || 2016 || 2017 || 2018||2019||2020||2021||2022
|'''Year''' || 2014 || 2015 || 2016 || 2017 || 2018||2019||2020||2021||2022||2023||
|-
|-
|'''Net Power Export (GWh<sub>e</sub>)''' ||3,368||4,636||5,291||6,258||6,230||6,703||7,769||8,643||9428
|'''Net Power Export (GWh<sub>e</sub>)''' ||3,368||4,636||5,291||6,258||6,230||6,703||7,769||8,643||9,428||9,676||10,040
|-
|-
|'''Net Heat Export (GWh<sub>th</sub>)''' ||NA||554||730||865||1,112||1,384||1,651||1,845||1,770
|'''Net Heat Export (GWh<sub>th</sub>)''' ||NA||554||730||865||1,112||1,384||1,651||1,845||1,770||1,777||1,949
|-
|-
|}
|}
Line 144: Line 90:
{{#clear_external_data:}}
{{#clear_external_data:}}


{{#get_db_data: db=engy |from=efwdb |where=status='Under Construction'|data=site=site,id=id,cap=cap}}
{{#get_db_data: db=mnk |from=ucsite |data=site=site,id=id,cap=cap,tech=tech}}
{|Class="wikitable sortable"
{|Class="wikitable sortable"
! ID !! Site Name !! Capacity (kt)
! ID !! Site Name !! Technology !! Capacity (kt)
{{#for_external_table:<nowiki/>
{{#for_external_table:<nowiki/>
{{!}}-
{{!}}-
{{!}} {{{id}}}.
{{!}} {{{id}}}.
{{!}} [[{{{site}}}]]
{{!}} [[{{{site}}}]]
{{!}} [[{{{tech}}}]]
{{!}} {{{cap}}}
{{!}} {{{cap}}}
}}
}}
|}
|}
Technology: EfW - EfW [[Incineration]]; ACT - [[Advanced Conversion Technology]]; WtF - [[Waste to Fuel]].


Summary site information collated from a variety of sources including: Monksleigh<ref name="monk" />, Tolvik<ref name="tolv" />, [[EA]], [[SEPA]], [[NRW]], [[DEFRA]], [[BEIS]], [[UKWIN]] and owner and developer websites</small>
Summary site information collated from a variety of sources including: Monksleigh<ref name="monk" />, Tolvik<ref name="tolv" />, [[EA]], [[SEPA]], [[NRW]], [[DEFRA]], [[BEIS]], [[UKWIN]] and owner and developer websites</small>
Line 163: Line 111:


==In Planning EfW==
==In Planning EfW==
The following list summarises all [[EfW]] sites that were in the planning process as at March 2021, which comprises those that have received [[Planning Permission|planning permission]] at some point and those that are presently in the consultation process seeking [[Planning Permission|planning permission]]. The total 'plated capacity' shown in the tables below is '''{{formatnum: {{#expr: {{#var:planton}} + {{#var:conston}}}}}} kt''' (Planning: '''{{formatnum: {{#var:planton}}}} kt''', Consulation: '''{{formatnum: {{#var:conston}}}} kt''').
The following list summarises all [[EfW]] sites that were in the planning process as at March 2021, which comprises those that have received [[Planning Permission|planning permission]] at some point and those that are presently in the consultation process seeking [[Planning Permission|planning permission]]. The total 'plated capacity' shown in the tables below is '''{{formatnum: {{#expr: {{#var:planton}} + {{#var:conston}}}}}} kt''' (Planning: '''{{formatnum: {{#var:planton}}}} kt''', Consultation: '''{{formatnum: {{#var:conston}}}} kt''').


In addition there are some plants below which have been reported as commencing construction, but this only applied to initial works or the construction of adjacent infrastructure, and not the [[EfW]] element of the project. The sites that fall into this category (i.e. the [[EfW]] is not thought to be under construction) in the list below include ID numbers 53, 59, 60, 63, 65, and 68.
In addition there are some plants below which have been reported as commencing construction, but this only applied to initial works or the construction of adjacent infrastructure, and not the [[EfW]] element of the project. The sites that fall into this category (i.e. the [[EfW]] is not thought to be under construction) in the list below include ID numbers 53, 59, 60, 63, 65, and 68.
Line 172: Line 120:
{{#clear_external_data:}}
{{#clear_external_data:}}


{{#get_db_data: db=engy |from=efwdb |where=status='Planning' and cap > 0 |data=site=site,id=id,cap=cap}}
{{#get_db_data: db=mnk |from=plsite |data=site=site,id=id,cap=cap,tech=tech}}
{|Class="wikitable"
{|Class="wikitable sortable"
! ID !! Site Name !! Capacity (kt)
! ID !! Site Name !! Technology !! Capacity (kt)
{{#for_external_table:<nowiki/>
{{#for_external_table:<nowiki/>
{{!}}-
{{!}}-
{{!}} {{{id}}}.
{{!}} {{{id}}}.
{{!}} [[{{{site}}}]]
{{!}} [[{{{site}}}]]
{{!}} [[{{{tech}}}]]
{{!}} {{{cap}}}
{{!}} {{{cap}}}
}}
}}
|}
|}
Technology: EfW - EfW [[Incineration]]; ACT - [[Advanced Conversion Technology]]; WtF - [[Waste to Fuel]].


===In Consultation===
===In Consultation===
{{#clear_external_data:}}
{{#clear_external_data:}}
{{#get_db_data: db=engy |from=efwdb |where=status='Consultation Stage' and cap > 0 |data=site=site,id=id,cap=cap}}
{{#get_db_data: db=mnk |from=consite |data=site=site,id=id,cap=cap,tech=tech}}
{|Class="wikitable sortable"
{|Class="wikitable sortable"
! ID !! Site Name !! Capacity (kt)
! ID !! Site Name !! Technology !! Capacity (kt)
{{#for_external_table:<nowiki/>
{{#for_external_table:<nowiki/>
{{!}}-
{{!}}-
{{!}} {{{id}}}.
{{!}} {{{id}}}.
{{!}} [[{{{site}}}]]
{{!}} [[{{{site}}}]]
{{!}} [[{{{tech}}}]]
{{!}} {{{cap}}}
{{!}} {{{cap}}}
}}
}}
|}
|}
Technology: EfW - EfW [[Incineration]]; ACT - [[Advanced Conversion Technology]]; WtF - [[Waste to Fuel]].