Protos EFW: Difference between revisions
No edit summary |
No edit summary |
||
| Line 11: | Line 11: | ||
==Plant== | ==Plant== | ||
The facility will use conventional [[grate]] [[combustion]] technology comprising two lines<ref>https://www.standardkessel-baumgarte.com/en/ | The facility will use conventional [[grate]] [[combustion]] technology comprising two lines<ref>https://www.standardkessel-baumgarte.com/en/references/efw-plant-in-cheshire-great-britain</ref> provided by [[Standardkessell Baumgarte GmbH]] and delivered by them in a joint venture with [[Mytilineos S.A]] over a three year construction period at a cost of c.£345 to £355 million<ref name="ref1" />. | ||
==Waste Input== | ==Waste Input== | ||