Municipal Waste Targets: Difference between revisions
m →UK targets: - insertation of table |
new text |
||
| (11 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
[[Category:Legislation & Policy]] | [[Category:Legislation & Policy]][[Category:Targets & Metrics]] | ||
==UK targets== | ==UK targets== | ||
A revised legislative framework on waste entered into force in July 2018 as part of the EU [[Circular Economy Package]] The new targets are as follows: | |||
Recycling | * Recycling of 55% of municipal waste by 2025 | ||
* Recycling of 60% of municipal waste by 2030 | |||
* Recycling of 65% of municipal waste by 2035 | |||
* Reduction in the amount of of municipal waste sent to landfill to a maximum of 10% by 2035. | |||
* Targets for the recycling of packaging waste have also been published and have been placed on the [[Packaging Waste]] page. | |||
In November 2021 the [[Environment Act 2021]] entered into force which introduced a further statutory target relating to the reduction in residual [[waste]] arisings. This target: | |||
Reduce residual waste (excluding major mineral wastes) kg per capita by 50% by 2042 from the 2019 level of approximately 560kg per capita. | |||
is currently out for consultion. | |||
==England== | |||
The Municipal Waste Targets for England remain the same as those mentioned for the UK above. | |||
==Wales== | ==Wales== | ||
| Line 37: | Line 25: | ||
The Municipal Waste targets for Wales are: | The Municipal Waste targets for Wales are: | ||
* 70% of waste to be used, recycled or composted by 2024/25 | *70% of waste to be used, recycled or composted by 2024/25 | ||
*30% of energy created by waste by 2024/25 | *30% of energy created by waste by 2024/25 | ||
*Landfill restriction of 5% of waste being sent to landfill by 2024/25 | *Landfill restriction of 5% of waste being sent to landfill by 2024/25 | ||
| Line 46: | Line 34: | ||
* a reduction of 1.2% per annum for [[Commercial Waste]] | * a reduction of 1.2% per annum for [[Commercial Waste]] | ||
*70% of [[Commercial and Industrial Waste]] to be recycled by 2025 | *70% of [[Commercial and Industrial Waste]] to be recycled by 2025 | ||
*Recycling and recovery rate of 90% by 2019/20 for [[Construction and Demolition Waste]]. | |||
*zero waste to [Landfill]] by 2025; and | *zero waste to [Landfill]] by 2025; and | ||
*Wales to achieve zero waste by 2050. | *Wales to achieve zero waste by 2050. | ||
Wales also have a non-statutory target to reduce the quantity of household waste by 1.2% per annum to 2050. | |||
==Scotland== | ==Scotland== | ||
Municipal Waste targets are outlined in The Waste (Scotland) Regulations 2012, as amended<ref>https://www.legislation.gov.uk/sdsi/2012/9780111016657/contents</ref>. They are as follows: | |||
*Local authorities to provide a basic recycling service to all households by 1 January 2014; | |||
*Local authorities to offer a food waste recycling service in non‐rural areas from 1 January 2016; | |||
*A ban on material collected for recycling going to landfill or incineration (from 1 January 2014); | |||
*A ban on [[Biodegradable Municipal Waste]] going to landfill by 1 January 2021; | |||
*All businesses and organisations to present key recyclable material for collection from 1 January 2014; | |||
*Food waste businesses producing over 50kg of food waste per week to present it for separate collection from 1 January 2014; | |||
*Food waste businesses producing over 5kg of food waste a week to present it for separate collection from 1 January 2016; | |||
*A ban on the use of macerators to discharge food waste into the public sewer from 1 January 2016; | |||
*All new [[Energy Recovery Facility|incinerators]] must ensure that metals and dense plastics have been removed from residual municipal waste prior to incineration<ref>https://www.nic.org.uk/wp-content/uploads/NIC-Anthesis-Report-and-Appendicies-FINAL.pdf</ref> | |||
==Northern Ireland== | |||
The Municipal Waste targets for Northern Ireland are found within the Northern Ireland Waste Management Strategy, Delivering Resource Effiency <ref>https://www.daera-ni.gov.uk/sites/default/files/publications/doe/waste-policy-delivering-resource-efficiency-northern-ireland-waste-management-strategy-2013.pdf</ref>. the targets are as follows: | |||
*To achieve a recycling rate of 50% (including preparing for re-use) of Household waste by 2020. | |||
*To achieve a recycling rate of 60% (including preparing for re-use) of [[LACMW]] by 2020. | |||
*To achieve a recovery rate (including preparing for re-use, recycling and other material recovery) of 70% for all non-hazardous Construction and Demolition waste by 2020. | |||
*To landfill no more than 429,000 tonnes of [[Biodegradable Municipal Waste]] by 2020. | |||
*To landfill no more than 220,000 tonnes of biodegradable [[LACMW]] by 2020 | |||
==References== | ==References== | ||
<references /> | <references /> | ||