[[Category:Technologies & Solutions]]
[[Category:Technologies & Solutions]]
The term 'Re-use' is defined within the [[Waste Framework Directive]] 2008/98/EC as ''any operation by which products or components that are not waste are used again for the same purpose for which they were conceived''.
The term [[Reuse]] is defined within the [[Waste Framework Directive]] 2008/98/EC as ''any operation by which products or components that are not waste are used again for the same purpose for which they were conceived''<ref>[https://ec.europa.eu/environment/waste/framework/ Waste Framework Directive]</ref>.


Given its application to 'waste'; Re-use is also a ‘waste destination’ description that appears in [[WasteDataFlow]].
The UK's 'right to repair' law, [[Ecodesign for Energy-Related Products and Energy Information Regulations 2021]], came into force in July 2021 and mandated manufacturers to make parts available for up to 10 years for specific large household appliances for up to 10 years after a product is discontinued. The intention was to support the repair and reuse of these appliances.
 
Given its application to [[waste]]; Re-use is also a ‘waste destination’ description that appears in [[WasteDataFlow]].


[[Waste Collection Authority|Waste Collection Authorities]] or [[Waste Disposal Authorities]] will select this option from a drop down list within [[WasteDataFlow]] if any items or materials collected by the [[Waste Collection Authority|Waste Collection Authorities]] (either kerbside or via their 'Bulky Waste' or 'Too Big for the Bin' Collections) or at [[Household Waste Recycling Centres]] can be directly re-used else where such as Clothing and [[Textiles]], bicycles, items of furniture etc.
[[Waste Collection Authority|Waste Collection Authorities]] or [[Waste Disposal Authorities]] will select this option from a drop down list within [[WasteDataFlow]] if any items or materials collected by the [[Waste Collection Authority|Waste Collection Authorities]] (either kerbside or via their 'Bulky Waste' or 'Too Big for the Bin' Collections) or at [[Household Waste Recycling Centres]] can be directly re-used else where such as Clothing and [[Textiles]], bicycles, items of furniture etc.


{| class="wikitable"
|-
! Location !! Project/Site !! Classification !! Status !! Capacity <ref> The capacity has been reproduced from the [[DEFRA]] data, but has not been verified in this table, and in some cases is known not to be up to date</ref> (ktpa) !! Plant Type !! Comment
|-
| Avonmouth || New Earth Solutions || [[PPP]] || Uncertain <ref> Future of site uncertain, still operational to contract handover, but site up for sale as of Jan 2020</ref> || 372 || [[MBT]] || Bought out of administration by [[PandaGreen]],currently services [[West of England Partnership | West of England]], contracts lost to [[Suez]] and [[Viridor]] from March 2020
|-
| Avonmouth || New Earth Energy || [[PPP]] || Mothballed<ref name="moth">In original data site was listed as operational this has been changed to Mothballed.</ref> || 73 || [[EfW]] || [[RDF]] from Avonmouth MBT fed this plant, technology failed, currently mothballed
|-
| Basingstoke || [[Chineham]] || [[PPP]] || Operational || 99 || EfW || [[Veolia]] site for [[Hampshire County Council]] and partners under [[Project Integra]]
|-
| Birmingham || [[Landor Street]] || [[PPP]] || Mothballed<ref name="moth" /> || 165 || MBT || [[Suez]] facility producing [[SRF]] moved to their site in Rugby, to supply [[Cemex]] cement kiln in Rugby
|-
| Birmingham || [[Tyseley]] || [[PPP]] || Operational || 361 || [[EfW]] || [[Veolia]] operated site, towards its end of life, contract to 2021(?), tender for new operator thereafter(?)
|-
| Bolton|| [[Raikes Lane]] || [[PFI]] || Operational || 86 || [[EfW]] || [[Viridor]] [[Laing]] consortium [[Greater Manchester Combined Authority | GMWA]] contract terminated 2017, now [[Suez]] from June 2019 for 7 years
|-
| Buckinghamshire || [[Greatmoor]] || [[PPP]] || Operational || 300 || [[EfW]] || [[FCC]] site primarily servicing [[Buckinghamshire County Council | Buckinghamshire]] under a 30 year [[Residual Waste |residual waste]] contract from 2012
|-
| Cambridgeshire || [[Waterbeach]] || [[PFI]] || Operational<ref name="op">In original data site was listed as In Construction this has been changed to Operational.</ref> || 200 || [[MBT]] || [[Amey Cespa]] site with variable performance reported, planning being pursued for new [[EfW]] on the site
|-
| Cornwall || [[St. Dennis]] || [[PFI]] || Operational || 240 || [[EfW]] || [[Suez]] site ([[Cornwall Energy Recovery]]) part of an integrated contract with [[ Cornwall Council | Cornwall ]] to 2039
|-
| Coventry || [[Coventry EFW]] || [[PPP]]<ref>A new PFI agreed in 2009 to replace the original plant and to include [[Warwickshire County Council |Warwickshire]] has not progressed to date</ref> || Operational || 245 || [[EfW]] || Operated by [[The Coventry and Solihull Waste Disposal Company Limited | CSWDC]] taking waste from [[Coventry City Council | Coventry]]and [[Solihull Metropolitan Borough Council | Solihull]].
|-
| Cumbria || [[Hespin Wood]] || [[PPP]] || Mothballed<ref name="moth" />|| 66 || [[MBT]] || [[Shanks | Renewi]] 25 year contract from 2009 for [[Cumbria County Council | Cumbria]] reported as under financial difficulty <ref> [https://www.letsrecycle.com/news/latest-news/carlisle-efw-proposed-as-part-of-cumbria-waste-plan/ Letsrecycle article re: Carlisle EfW and context of current PPP contract]</ref>
|- 
| Cumbria || [[Barrow-in-Furness]]|| [[PPP]] || Mothballed || 50 || [[MBT]] || [[Shanks | Renewi]] 25 year contract from 2009 for [[Cumbria County Council | Cumbria]] reported as under financial difficulty
|-
| Derbyshire || [[Sinfin Lane]] || [[PPP]] || Uncertain <ref> After issues with the initial commissioning of the MBT part of the project, there were then extended delays in commissioning the [[EfW]] portion of contract - plant delivery/final commissioning is presently unclear </ref>  || 190 || [[EfW]] || Termination of contract reported Aug. '19 between [[Derby City Council]] and [[Derbyshire County Council]] and [[Renewi]]
|-
| Dudley || [[Lister Road]] || [[PPP]] || Operational || 93 || [[EfW]] || Operated by [[MES Environmental]]
|-
| [[ELWA]] 1 || [[Frog Island]] || [[PFI]] || Operational || 180 || [[MBT]] || [[Renewi]] site servicing [[East London Waste Disposal Authority | ELWA]], recently reported financial difficulty
|-
| [[ELWA]] 2 || [[Jenkins Lane]] || [[PFI]] || Operational || 180 || [[MBT]] || [[Renewi]] site servicing [[East London Waste Disposal Authority | ELWA]], recently reported financial difficulty
|-
| East Sussex || [[Newhaven]] || [[PFI]] || Operational || 234 || [[EfW]] || Servicing [[East Sussex County Council]] and [[Brighton and Hove City Council]]
|-
| Essex || [[Courtauld Road]] || [[PFI]] || Operational<ref name="op" /> || 417 || [[MBT]] || Developed and operated by partners [[Urbaser Balfour Beatty]] servicing [[Essex County Council]] and [[Southend-on-Sea Borough Council | Southend]], reported operational difficulties
|-
| Exeter || [[Marsh Barton]] || [[PPP]] || Operational || 60 || [[EfW]] || Developed and operated by [[Viridor]] in partnership with [[Devon County Council]] with a focus on Exeter and the immediate surrounds
|-
| Ferrybridge || [[Multifuel 1]] (FM1) || [[PPP]] || Operational || 400 || [[EfW]] || Joint Venture between [[Wheelabrator]] and [[SSE]], includes [[Cumbria County Council | Cumbria]] via their contract with [[Renewi]] for [[RDF]] from their [[MBT]] facilities
|-
| Gloucestershire || [[Javelin Park]] || [[PPP]] || Operational<ref name="op" /> || 190 || [[EfW]] || Delivery by partners [[Urbaser Balfour Beatty]] primarily serving [[Gloucestershire County Council | Gloucestershire]]
|-
| Greater Manchester || [[Longley Lane]] || [[PFI]] || Operational || 110 || [[MBT]] || [[Viridor]] [[Laing]] consortium [[PFI]] contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years
|-
| Greater Manchester || [[Runcorn Phase 1]] || [[PFI]] || Operational || 325 || [[EfW]] || [[Viridor]] bought out [[Laing]] in Nov 2018 and continues to operate under contract with [[Greater Manchester Combined Authority | GMWA]] to 2035<ref>As part of the restructuring of the PFI contract, with option to extend </ref>
|-
| Greater Manchester || [[N. Manchester]] || [[PFI]] || Operational || 65 || [[MBT]] || [[Viridor]] [[Laing]] consortium [[PFI]] contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years
|-
| Greater Manchester || [[Oldham]] || [[PFI]] || Operational || 99|| [[MBT]] || [[Viridor]] [[Laing]] consortium [[PFI]] contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years
|-
| Greater Manchester || [[Salford]] || [[PFI]] || Operational || 73 || [[MBT]] || [[Viridor]] [[Laing]] consortium [[PFI]] contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years
|-
| Greater Manchester || [[Stockport]] || [[PFI]] || Operational || 92 || [[MBT]] || [[Viridor]] [[Laing]] consortium [[PFI]] contract with [[Greater Manchester Combined Authority | GMWA]] terminated 2017, now [[Suez]] from June 2019 for 7 years
|-
| Hartlepool || [[Tees Valley Lines 1 &2]] || [[PPP]] || Operational || 345 || [[EfW]] || Operated by [[Suez]] receiving [[Residual Waste | waste]] from several local authorities in the North-East, primarily for [[Northumberland Council | Northumberland]]
|-
| Herefordshire || [[Hartlebury]] || [[PPP]] || In Construction || 200 || [[EfW]] || [[Severn Waste Services]] operated plant, owned by [[FCC]] and [[Urbaser]], 25 year contract for [[Herefordshire Council | Herefordshire]] and [[Worcestershire County Council | Worcestershire]] to 2023
|-
| Hertfordshire || [[Hoddesdon]] || [[PPP]] || Terminated <ref> The project was called in at a very late stage by the secretary of state and refused planning consent after strong local opposition, leading to the termination of the long term residual waste contract between [[Hertfordshire County Council | Hertfordshire]] and [[Veolia]] reported in Aug 2019</ref> || 320 || [[EfW]] || Long term contract with [[Hertfordshire County Council | Hertfordshire]] terminated
|-
| Isle of Wight || [[Isle of Wight]] [[Gasification]] || [[PPP]] ||In Construction || 40 || [[EfW]] || Development between [[Amey]] and [[Isle of Wight Council]], delays in commissioning reported to early 2020
|-
| Isle of Wight || [[Isle of Wight WM Project]] || [[PPP]] ||Operational  ||80 || [[MBT]] || Development between [[Amey]] and [[Isle of Wight Council]]
|-
| Kent || [[Allington]] || [[PPP]] || Operational || 427 || [[EfW]] || [[FCC]] site servicing primarily [[Kent County Council]]
|-
| Kirklees || [[Vine Street]] || [[PFI]] || Operational || 127 || [[EfW]] || [[Suez]] operated site primarily for [[Kirklees Metropolitan Council | Kirklees]]
|-
| Colnbrook || [[Lakeside]] || [[PPP]] || Operational || 436 || [[EfW]] || [[Viridor]] and [[Grundon]] Joint Venture which will require moving to accommodate Heathrow 3rd runway
|-
| Leeds || [[Cross Green]] || [[PFI]] || Operational || 165 || [[EfW]] || Site developed by [[Veolia]] on behalf of [[Leeds City Council]] under a 25 year contract to 2037
|-
| Leicstershire  || [[Mowmacre Hill]] || [[PFI]] || Operational || 120 || [[MBT]]<ref> The technology utilized under the contract is the only one in the UK and is known as a 'Ball Mill'</ref>  || Integrated contract delivered by [[Biffa]] for [[Leicester City Council]] for 25 years from 2002
|-
| Leicstershire  || [[Cotesbach]] || [[PPP]] || Operational || 50 || [[MBT]] || Operational plant by New Earth Solutions bought out of administration by [[PandaGreen]],currently services [[Leicestershire County Council]]
|-
| Lincolnshire || [[North Hykeham]] || [[PPP]] || Operational || 154 || [[EfW]] || [[FCC]] facility primarily for [[Lincolnshire County Council]] under 25 year contract
|-
| L.B. Southwark ||[[Old Kent Road]]  || [[PFI]] || Operational || 100 || [[MBT]]<ref> Integrated site includes a [[Gasification]] facility which is in extended commissioning </ref>|| [[Suez]] integrated facility servicing [[Southwark London Borough Council | Southwark]]
|-
| Merseyside || [[Wilton]] || [[PPP]] || Operational<ref name="op" /> || 440 || [[EfW]] || [[Suez]] site in Teeside, waste hauled by rail from Merseyside transfer station under contract with [[Merseyside Waste Disposal Authority | MWDA]]
|-
| Milton Keynes || [[Wolverton]] || [[PPP]] || In Construction <ref> Reported in mid 2018 as operational ([https://www.letsrecycle.com/news/latest-news/amey-overcomes-teething-problems-in-milton-keynes/ Letsrecycle article dated July 2018]), the [[Gasification]] facility had extended commissioning issues</ref> || 80 || [[EfW]] || Integrated facility delivered by [[Amey]] primarily for [[Milton Keynes Council]] for 15 years from 2013
|-
| NE Lincolnshire || [[Stallingborough]] || [[PPP]] ||Operational  ||53  || [[EfW]] || [[Newlincs]] facility for [[North East Lincolnshire Council | North East Lincolnshire]] under 25 year contract
|-
| Newcastle || [[Byker/Ellington]] || [[PPP]] || Operational || 187 || [[MBT]] || [[Suez]] facility serving primarily [[Newcastle upon Tyne City Council | Newcastle]]
|-
| North London || [[Edmonton]] || [[PPP]] || Operational || 512 || [[EfW]] || [[North London Waste Disposal Authority | NLWA]] site, currently going through planning process to be replaced as at end of life
|-
| North Somerset || [[BOOMECO Avonmouth]] || [[PPP]] || Operational || 50 || [[MBT]] || [[Boomecho]] bought by [[Veolia]] out of administration, serviced [[North Somerset Council]] but based in Avonmouth Docks, [[RDF]] export focused
|-
| North Yorkshire || [[Allerton]] || [[PPP]] || Operational<ref name="op" /> || 320 || [[EfW]] || [[Amey]]<ref> [[Amey]] is partnered with [[Equitix]] and [[Pensions Infrastructure Platform]] [https://www.letsrecycle.com/news/latest-news/ameys-allerton-efw-declared-fully-operational/ (Letsrecycle article dated March 2018)]</ref> facility servicing [[North Yorkshire County Council | North Yorkshire]] and [[York City Council | York]], moved into its 25 year operating phase in March '18
|-
| Nottingham || [[Eastcroft 3rd Line]] || [[PPP]] || Consented || 140 || [[EfW]] || [[FCC]] facility delivering shared capacity between [[FCC]], [[Nottingham City Council]] and [[Nottinghamshire County Council | Nottinghamshire]]
|-
| Nottingham || [[Eastcroft]] || [[PPP]] || Operational || 158 || [[EfW]] || [[FCC]] facility delivering shared capacity between [[FCC]], [[Nottingham City Council]] and [[Nottinghamshire County Council | Nottinghamshire]]
|-
| Oxfordshire || [[Ardley]] || [[PPP]] || Operational || 300 || [[EfW]] || [[Viridor]] facility servicing primarily [[Oxfordshire County Council | Oxfordshire]] under a 25 year contract from March 2011
|-
| Peterborough || [[Fourth Drove, Fengate]] || [[PPP]] || Operational || 85 || [[EfW]] || [[Viridor]] facility serving [[Peterborough City Council]] under a 30 year contract
|-
| Portsmouth || [[Portsmouth Project Integra]] || [[PPP]] || Operational || 198 || [[EfW]] || [[Veolia]] site for [[Hampshire County Council]] and partners under [[Project Integra]]
|-
| Rugby || [[Malpass Farm]] || [[PPP]] || Operational || 200 || [[MBT]] || [[Suez]] facility producing [[SRF]], to supply [[Cemex]] cement kiln in Rugby, also receiving tonnage previously designated to Birmingham facility
|-
| Sheffield || [[Bernard Road]] || [[PPP]] || Operational || 207 || [[EfW]] || Was part of wider 35 year contract with [[Veolia]] to 2036, now [[EfW]] contract only with termination of wider contract in 2017
|-
| Shropshire || [[Battlefield Enterprise Park]] || [[PFI]] || Operational || 90 || [[EfW]] || Site developed by [[Veolia]] as part of a 25 year contract with [[Shropshire Council | Shropshire]]
|-
| S.E. London || [[SELCHP]] || [[PPP]] || Operational || 431 || [[EfW]] || [[Veolia]] site taking waste from [[Lewisham London Borough Council | Lewisham]], [[Greenwich London Borough Council | Greenwich]], [[Westminster City Council | Westminster]] and [[Bromley London Borough Council | Bromley]]
|-
| S. London || [[Beddington Lane]]|| [[PPP]] || Operational<ref name="op" /> ||300 || [[EfW]] || [[Viridor]] facility primarily serving [[Croydon London Borough Council | Croydon]], [[Kingston upon Thames London Borough Council| Kingston]], [[Merton London Borough Council | Merton]], [[Richmond upon Thames London Borough Council | Richmond]] and [[Sutton London Borough Council | Sutton]]
|-
| South Tyne & Wear || [[Teeside Lines 4&5]] || [[PFI]] || Operational || 256 || [[EfW]] || [[Suez]] facility<ref> This site comprises a number of facilities in the same general area</ref> serving [[Stockton-on-Tees Borough Council | Stockton]], [[Middlesbrough Council | Middlesbrough]], [[Redcar and Cleveland Borough Council | Redcar & Cleveland]] and [[Northumberland Council |Northumberland]] and the [[South Tyne & Wear Partnership]]
|-
| South Devon || [[Devonport]] || [[PFI]] || Operational || 245 || [[EfW]] || [[MVV Umwelt]] facility serving [[South West Devon Waste Partnership]] under a 25 year contract
|-
| South Yorkshire || [[Bolton Road, Manvers]] || [[PFI]] ||Operational || 286 || [[MBT]] || [[Renewi]] partnership with [[SSE]] delivering integrated [[MBT]] and [[AD]] facility to [[Barnsley, Doncaster and Rotherham Waste Partnership]] to 2040
|-
| Southampton || [[Marchwood Project Integra]] || [[PPP]] || Operational || 198 || [[EfW]] || [[Veolia]] site for [[Hampshire County Council]] and partners under [[Project Integra]]
|-
| Staffordshire || [[Four Ashes]] || [[PFI]] || Operational || 325 || [[EfW]] || [[Veolia]] operated site for [[Staffordshire County Council]], 25 year contract from July 2010, with inputs also from [[Sandwell Metropolitan Borough Council | Sandwell]], [[Warwickshire County Council | Warkwickshire]] and [[Walsall Metropolitan Borough Council | Walsall]]
|-
| Stoke on Trent || [[Campbell Road]] || [[PPP]] || Operational || 174 || [[EfW]] || Operated by [[MES Environmental]]
|-
| Suffolk || [[Great Blakenham]] || [[PFI]]<ref> Discussions within Suffolk around re-financing reported in 2018 [https://www.letsrecycle.com/news/latest-news/suffolk-refinancing-great-blakenham-efw/ (Letsrecycle article November 2018]</ref> || Operational || 269 || [[EfW]] || [[Suez]] facility delivered primarily for [[Suffolk County Council | Suffolk]] under 25 year contract, with later deal for cross-border tonnage from [[Norfolk County Council | Norfolk]]
|-
| Surrey || [[Charlton Lane Eco Park]] || [[PFI]] || In Construction || 60 || [[EfW]] || [[Suez]] integrated [[AD]] and [[Gasification]] facility for [[Surrey County Council | Surrey]] has had delays in commissioning the latter, now forecast Q1 2020
|-
| Swindon || [[Chaney Manor]] || [[PPP]] || Operational || 48 || [[MBT]]<ref>The technology is better described as mechanical sorting or a [[Dirty MRF]] with no biological treatment as part of the process</ref> || [[Swindon Commercial Services]] facility for [[Swindon Borough Council | Swindon]]
|-
| Wakefield || [[South Kirby]] || [[PFI]] || Operational || 146 || [[MBT]] || [[Renewi]] integrated contract for [[Wakefield City Council]]
|-
| West London || [[Severnside Avonmouth]] || [[PPP]] || Operational || 350 || [[EfW]] || [[Suez]] site in Avonmouth, supplied by train from a transfer in West London for [[West London Waste Disposal Authority | WLWA]], plus some local waste including [[West of England Partnership | West of England]]
|-
| West Sussex || [[Brookhurst Wood]] || [[PPP]] || In Construction || 327 || [[MBT]] || [[Biffa]] facility delivered for [[West Sussex County Council | West Sussex]]
|-
| Western Riverside || [[Belvedere]] || [[PPP]] || Operational || 688 || [[EfW]] || [[Cory]] site in Bexley, supplied by river from two transfer stations for [[Western Riverside Waste Disposal Authority | WRWA]], plus some local tonnage for [[Bexley London Borough Council | Bexely]]
|-
| Whites Pit, Poole || [[Canford]] || [[PPP]] || Operational || 50 || [[MBT]] || Operational plant by New Earth Solutions bought out of administration by [[PandaGreen]],currently primarily services [[Bournemouth, Christchurch and Poole |Bournemouth ]]
|-
| Wiltshire || [[Northacre Farm]] || [[PPP]] || Operational || 60 || [[MBT]] || [[Hills]] site at Westbury servicing [[Wiltshire Council]]
|-
| Wolverhampton || [[Crown Street EFW]] || [[PPP]] || Operational || 108 || [[EfW]] || Operated by [[MES Environmental]]
|}
==References==
==References==
<references />
<references />

Latest revision as of 09:08, 8 April 2022

The term Reuse is defined within the Waste Framework Directive 2008/98/EC as any operation by which products or components that are not waste are used again for the same purpose for which they were conceived[1].

The UK's 'right to repair' law, Ecodesign for Energy-Related Products and Energy Information Regulations 2021, came into force in July 2021 and mandated manufacturers to make parts available for up to 10 years for specific large household appliances for up to 10 years after a product is discontinued. The intention was to support the repair and reuse of these appliances.

Given its application to waste; Re-use is also a ‘waste destination’ description that appears in WasteDataFlow.

Waste Collection Authorities or Waste Disposal Authorities will select this option from a drop down list within WasteDataFlow if any items or materials collected by the Waste Collection Authorities (either kerbside or via their 'Bulky Waste' or 'Too Big for the Bin' Collections) or at Household Waste Recycling Centres can be directly re-used else where such as Clothing and Textiles, bicycles, items of furniture etc.

References