Bulwell Energy: Difference between revisions
Imported from text file |
Arctellion (talk | contribs) No edit summary |
||
(4 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
[[Category:EfW Plants]][[ | {{#vardefine:epr|CP3737CV}}[[Category:EfW Plants]] | ||
{{EfWTemplate|EPR= | An [[EfW]] facility based upon [[Gasification]] technology. [[Bulwell Energy Ltd]] is a subsidiary of [[Chinook]] and the site is geographically close to the demonstration plant they have in Nottingham. Whilst an Environmental Permit was issued in late 2018 <ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/749091/Partial_Surrender_Notice.pdf Gov.uk Website]</ref> no construction is understood to have commenced. | ||
{{EfWTemplate|EPR={{#var:epr}}|id=59}}__TOC__<br clear='left' /> | |||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon [[Gasification]] technology. [[Bulwell Energy Ltd]] is a subsidiary of [[Chinook]] and the site is geographically close to the demonstration plant they have in Nottingham. Whilst an Environmental Permit was issued in late 2018 <ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/749091/Partial_Surrender_Notice.pdf Gov.uk Website]</ref> no construction is understood to have commenced. | |||
== | ==Technology== | ||
The plant was based on [[Chinook]]'s [[RODECS]] [[Gasification]] technology. | |||
== | ==Construction== | ||
There is no information on the current status of funding or construction. It appears that the focus is presently on the commercial production of activated carbon<ref>http://www.chinooksciences.com/news/#.YFHj-NpxeUk</ref>. | |||
== | ==Waste Input== | ||
The overall facility was designed to run on 160,000 tonnes per annum of [[RDF]]. | |||
==References== | ==References== | ||
<references /> | <references /> |
Latest revision as of 11:05, 7 May 2021
An EfW facility based upon Gasification technology. Bulwell Energy Ltd is a subsidiary of Chinook and the site is geographically close to the demonstration plant they have in Nottingham. Whilst an Environmental Permit was issued in late 2018 [1] no construction is understood to have commenced.
Bulwell Energy Planning | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | CP3737CV |
Operator | Chinook Sciences |
Region | East Midlands |
Operational Capacity | 160ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 29.50MWe |
Number of Lines | 0 |
Number of Turbines | 0 |
CHP | No |
Technology Approach | ACT |
Funding Type | Merchant |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2017 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2018 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2019 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 0.00 | 0.00% | 0.00 | 0.00% |
2017 | 0.00 | 0.00% | 0.00 | 0.00% |
2018 | 0.00 | 0.00% | 0.00 | 0.00% |
2019 | 0.00 | 0.00% | 0.00 | 0.00% |
Summary
An EfW facility based upon Gasification technology. Bulwell Energy Ltd is a subsidiary of Chinook and the site is geographically close to the demonstration plant they have in Nottingham. Whilst an Environmental Permit was issued in late 2018 [2] no construction is understood to have commenced.
Technology
The plant was based on Chinook's RODECS Gasification technology.
Construction
There is no information on the current status of funding or construction. It appears that the focus is presently on the commercial production of activated carbon[3].
Waste Input
The overall facility was designed to run on 160,000 tonnes per annum of RDF.