Newlincs EfW: Difference between revisions
Imported from text file |
Arctellion (talk | contribs) No edit summary |
||
| (7 intermediate revisions by 3 users not shown) | |||
| Line 1: | Line 1: | ||
[[Category:EfW Plants]][[ | {{#vardefine:epr|BT4249IB}}[[Category:EfW Plants]] | ||
{{EfWTemplate|EPR= | An [[EfW]] facility based upon conventional combustion technology and not considered an [[ERF]] as yet based upon it not having [[R1]] status. Newlincs has permitted operational capacity of 60,000 tonnes per annum, owned and operated by [[Cyclerval-UK]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]].{{EfWTemplate|EPR={{#var:epr}}|id=43}}[[File:Cyclerval Newlincs.png|350px|left|Cyclerval New Lincs: Attributed to Alan Murray-Rust, CC BY-SA 2.0]]__TOC__<br clear='left' /> | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology and not considered an [[ERF]] as yet based upon it not having [[R1]] status. Newlincs has permitted operational capacity of 60,000 tonnes per annum, owned and operated by [[Cyclerval-UK]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]]. | |||
==History== | ==History== | ||
The Newlincs facility was built primarily to service a 25 year [[PPP]] contract signed in 1999 with [[North East Lincolnshire Council]], with anticipated total throughput of up to 56,000 tonnes per annum<ref>[http://www.newlincs.com/home.html Newlincs Website]</ref>. The site is located between Grimsby and Immingham. | |||
==Plant== | ==Plant== | ||
Built by [[TIRU SA]] (now part of [[Dalkia]]<ref>[https://www.dalkiawastenergy.com/history-tiru Dalkia Waste Energy Website]</ref>, part of the [[EDF Group]]) under a Design & Build [[EPC]]-turnkey contract which was delivered and operational in 2003 it is similar to the [[Exeter Energy Recovery Facility|Exeter]]. | |||
The plant comprises of one line with a design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]]. Power output design is reported is 4MWe for [[Exeter Energy Recovery Facility|Exeter]], but electrical capacity is shown as 3.2MWe, consistent with other reported figures. | |||
== | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references /> | <references /> | ||