Showground Road: Difference between revisions
Imported from text file |
Arctellion (talk | contribs) No edit summary |
||
| (11 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
[[Category:EfW Plants]][[ | {{#vardefine:epr|UP3708SB}} | ||
{{EfWTemplate|EPR= | |||
[[Category:EfW Plants]]An [[EfW]] facility based upon standard [[combustion]] technology. The Showground Road site is being delivered by a joint venture between [[Equitix]] and [[Iona Capital]] known as [[Bridgwater Resource Recovery Limited]]. | |||
{{EfWTemplate|EPR={{#var:epr}}|id=62}} | |||
[[File:1615908114673.jpg|350px|left|Showground Road in Construction March 2021 - Image from STC all rights reserved]]__TOC__<br clear='left'/> | |||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon standard [[combustion]] technology. The Showground Road site is being delivered by a joint venture between [[Equitix]] and [[Iona Capital]] known as [[Bridgwater Resource Recovery Limited]]. | |||
==Technology== | |||
The plant is a 1 line, moving [[grate]] based technology by [[Kablitz]], generating steam via a [[Comef]] boiler, to turbines delivering 7.75MWe. | |||
== | ==Construction== | ||
The plant is being constructed under a turnkey [[EPC]] arrangement at a capital cost of GBP £72m by [[STC Power SRL]] and will be operated and maintained by [[Pinacle Power Limited]], with operations due to commence in late 2021. | |||
== | ==Waste Input== | ||
The plant is designed to run on 100,000 tonnes per year of prepared [[RDF]] under an exclusive supply/aggregation arrangement with [[Geminor]]<ref>[https://equitix.co.uk/news/equitix-and-loan-capital-co-fund-bridgwater-energy-from-waste-project/ Equitix Website]</ref>. | |||
==References== | ==References== | ||
<references /> | <references /> | ||