Dunbar EfW (Oxwellmains EfW): Difference between revisions

Bin52 (talk | contribs)
m add picture and link
Bin52 (talk | contribs)
add page specific text
 
(7 intermediate revisions by 3 users not shown)
Line 1: Line 1:
[[File:Viridor Dunbar.png|290px|left|Viridor Beddington]]
{{#vardefine:epr|PPC/A/1032878}}[[Category:EfW Plants]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
An [[EfW]] facility based upon conventional combustion technology which as yet does not have [[R1]] status. Dunbar has permitted operational capacity of 300,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]] <ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/dunbar-erf/ Viridor Website]</ref> mainly in the form of a prepared [[RDF]]{{EfWTemplate|EPR={{#var:epr}}|id=51}}[[File:Viridor Dunbar.png|290px|left|Viridor Beddington]]__TOC__<br clear='left' />
{{EfWTemplate|EPR=PPC/A/1032878|id=51}}


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology which as yet does not have [[R1]] status. Dunbar has permitted operational capacity of 300,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]] <ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/dunbar-erf/ Viridor Website]</ref> mainly in the form of a prepared [[RDF]]


==History==
==History==
The Dunbar facility was built to service Scotland's residual [[Household Waste]] and [[Commercial Waste]] and includes [[RDF]] from its contract with [[Clyde Valley]] in May 2016 which processes 190,000 tonnes per annum via [[Viridor]]'s [[Bargeddie]] site in North Lanarkshire (which opened in January 2020). It is located in East Lothian on [[Viridor]]'s [[Landfill]] site which is due to close with the operation of the facility, which commenced in January 2019. 


==Plant==
==Plant==
Built by a JV between [[Interserve]] and [[Babcox & Wilcox Volund A/S]] as a turnkey [[EPC]] contract, which started in 2015 and was delivered in January 2019 at a reported <ref>[https://www.letsrecycle.com/news/latest-news/viridor-gets-to-work-on-dunbar-efw-plant/ Letsrecycle Article]</ref> £177m capital cost.
The plant comprises 2 lines via standard combustion B&W Volund proprietary Dynagrate technology, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability up to 320,000 tonnes per annum based on a prepared [[WDF]] fuel [[CV]] of 10MJ/kg<ref>[http://www.volund.dk/~/media/Downloads/Brochures_-_WTE/Dunbar_-_Scotland.pdf B&W Volund Website]</ref>.


==Local Authority Users==
==Local Authority Data==
 
The [[Residual EfW]] pages for sites located in England and Wales capture the data reported by Local Authorities, through [[WasteDataFlow]], received at those sites. In Scotland this data is not reported, meaning that the destination in [[WasteDataFlow]] is not defined and the origin in the regulator returns for a facility receiving the tonnage is also not reported (resulting in a 'NA' in the table in the section below). As a result it is not possible to report for Scottish sites in the same way as other sites in WikiWaste.
{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />