Riverside Resource Recovery Facility (RRRF): Difference between revisions

Bin52 (talk | contribs)
m expanded text
Bin52 (talk | contribs)
 
(15 intermediate revisions by 5 users not shown)
Line 1: Line 1:
[[File:Cory Riverside.png|250px|left|Cory Riverside]]
{{#vardefine: epr|BK0825IU}}
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=BK0825IU|id=2}}
An [[EfW]] facility based upon conventional [[combustion]] technology and considered an [[ERF]] based on its [[R1]] status. [[Riverside Resource Recovery Facility (RRRF)]] has permitted operational capacity of 850,000 tonnes per annum, operated by [[Cory Riverside Energy]]. Delivery of waste is primarily by barge on the River Thames, with some tonnage by road, and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.coryenergy.com/about-us/our-history/ Cory Website]</ref>.
{{EfWTemplate|EPR={{#var: epr}}|id=2}}
[[File:Cory Riverside.png|250px|left|Cory Riverside]]<ref>[http://www.hz-inova.com/cms/wp-content/uploads/2014/12/hzi_ref_riverside-en.pdf Riverside Resource Recovery Facility Site Photo] All Rights Reserved </ref>__TOC__
<br clear='left'/>


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Riverside has permitted operational capacity of 750,000 tonnes per annum, operated by [[Cory Riverside Energy]]. Delivery of waste is primarily by barge on the River Thames, with some tonnage by road, and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.coryenergy.com/about-us/our-history/ Cory Website]</ref>.
An [[EfW]] facility based upon conventional [[combustion]] technology and considered an [[ERF]] based on its [[R1]] status. [[Riverside Resource Recovery Facility (RRRF)]] has permitted operational capacity of 850,000 tonnes per annum (increased from 780,000 tonnes per annum in August 2022), operated by [[Cory Riverside Energy]]. Delivery of waste is primarily by barge on the River Thames, with some tonnage by road, and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.coryenergy.com/about-us/our-history/ Cory Website]</ref>.


==History==
==History==
The Riverside facility was built primarily to service a 30 year [[PPP]] contract signed in 2002 with [[Western Riverside Waste Disposal Authority |WRWA]], with anticipated total throughput of up to 585,000 tonnes per annum - receiving additional residual [[Commercial Waste]] and some [[Household Waste]] from other local authorities, primarily via river-based transfer facilities. It is located on the banks of the River Thames at Belvedere, in Bexley. IN June 2018 [[Cory Riverside Energy]] was sold to a consortium of investors, including [[Dalmore Capital]], [[Fiera Infrastructure]], [[Semperian PPP Investment Partners]] and [[Swiss Life Asset Managers]]<ref>[https://www.letsrecycle.com/news/latest-news/cory-sold-to-consortium-of-investors/ Letsrecycle Article]</ref> with a second plant planned on an adjacent site currently in the planning process<ref>[https://www.letsrecycle.com/news/latest-news/cory-plans-second-london-efw/ Letsrecycle Article]</ref>.  
The Riverside facility was built primarily to service a 30 year [[PPP]] contract signed in 2002 with [[Western Riverside Waste Disposal Authority |WRWA]], with anticipated total throughput of up to 585,000 tonnes per annum - receiving additional residual [[Commercial Waste]] and some [[Household Waste]] from other local authorities, primarily via river-based transfer facilities. It is located on the banks of the River Thames at Belvedere, in Bexley. In June 2018 [[Cory Riverside Energy]] was sold to a consortium of investors, including [[Dalmore Capital]], [[Fiera Infrastructure]], [[Semperian PPP Investment Partners]] and [[Swiss Life Asset Managers]]<ref>[https://www.letsrecycle.com/news/latest-news/cory-sold-to-consortium-of-investors/ Letsrecycle Article]</ref> with a second plant planned on an adjacent site currently in the planning process<ref>[https://www.letsrecycle.com/news/latest-news/cory-plans-second-london-efw/ Letsrecycle Article]</ref>.  


==Plant==
==Plant==
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract which started in summer 2008 and was delivered in 2010 at a reported <ref>[http://www.hz-inova.com/cms/wp-content/uploads/2014/12/hzi_ref_riverside-en.pdf Hitachi Zosen Inova pdf]</ref> EU400m capital cost.
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract which started in summer 2008 and was delivered in 2010 at a reported <ref>[https://www.hz-inova.com/files/2014/11/hzi_ref_riverside-en.pdf Hitachi Zosen Inova pdf]</ref> EU400m capital cost.
The plant comprises 3 lines of 31.8 tonnes/hour design capacity capable of treating 585,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate R-1000104, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] with a [[CV]] of between 7 and 13MJ/kg to deliver 65MWe of power.  
The plant comprises 3 lines of 31.8 tonnes/hour design capacity capable of treating 585,000 tonnes per annum via standard [[combustion]] technology, air cooled, [[Hitachi Zosen Inova]] [[Grate]] R-1000104, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] with a [[CV]] of between 7 and 13MJ/kg to deliver 65MWe of power. Current capacity is higher with lower [[NCV]].


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var:epr}}}}


==References==
==References==
<references />
<references />