An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Wilton 11 has a permitted operational capacity of 500,000 tonnes per annum, and is owned by a joint venture between [[Suez]] and [[Sembcorp]] and operated by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.sembcorp.co.uk/our-services/our-services/energy/ Sembcorp Website]</ref>.
 
{{EfWTemplate|EPR={{#var:epr}}|id=9}}
[[File:Suez Wilton 11.png|350px|left|Suez-Semcorp EFW]]__TOC__
<br clear='left' />
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Wilton 11 has permitted operational capacity of 444,000 tonnes per annum, and is owned by a joint venture between [[Suez]] and [[Sembcorp]] and operated by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.sembcorp.co.uk/our-services/our-services/energy/ Sembcorp Website]</ref>.
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Wilton 11 has a permitted operational capacity of 500,000 tonnes per annum, and is owned by a joint venture between [[Suez]] and [[Sembcorp]] and operated by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.sembcorp.co.uk/our-services/our-services/energy/ Sembcorp Website]</ref>.
 
==History==
The Wilton 11 facility was built primarily to service a 30 year [[PPP]] contract signed in April 2013 with [[Mersyside Waste Disposal Authority| Merseyside]] <ref>[https://www.power-technology.com/projects/teesside-energy-from-waste-efw-facility/ Power Technology Website]</ref>, with anticipated input of 440,000 tonnes per annum i.e the majority of the tonnage. of the total design capacity of 350,000 tonnes per annum - receiving additional residual [[Commercial Waste]]. It is located in Cardiff bay and has been operational since 2014. 


==Plant==
Built by [[CNIM]] and [[Clugson]] construction started in 2014 and completed 2016which started in Spring 2012 and was delivered in 2014<ref>[https://laganscg.com/news/lagan-construction-is-awarded-50-million-energy-from-waste-contract-in-cardiff Lagan Website]</ref> at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Projects Website]</ref> £206m capital cost.
The plant comprises 2 lines via standard combustion technology Martin reverse acting grate, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]].
==History==
==History==
The Wilton 11 facility was built primarily to service a 30 year [[PPP]] contract signed in April 2013 with [[Mersyside Waste Disposal Authority| Merseyside]] <ref>[https://www.power-technology.com/projects/teesside-energy-from-waste-efw-facility/ Power Technology Website]</ref>, with anticipated input of 440,000 tonnes per annum i.e the majority of the tonnage. [[Residual Waste]] is loaded at [[Knowsley Rail Transfer Station]] prior to its transport to Wilton 11. It was formally opened in June 2018 <ref>[https://www.letsrecycle.com/news/latest-news/suez-wilton-efw-opened/ Letsrecycle Article]</ref>. It is located in Teeside on the Wilton International Industrial Estate and is discrete from [[Wilton 10]] which is a [[Biomass Waste EFW]] project. 


==Plant==
==Plant==
Built by [[CNIM]] and [[Clugson]] construction started in 2014 and was completed in 2016 at a reported £250m capital cost, generating 49 MWe and steam for the adjacent [[Sembcorp]] site, although the listing does not show it to be a [[CHP]] plant<ref>[https://www.gazettelive.co.uk/business/business-news/wilton-11-work-250m-create-7967920 Local Press Article]</ref>. The finance and delivery was under a build, own, operate and transfer contract with [[Mersyside Waste Disposal Authority| Merseyside]].