Coventry EfW Plant: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Arctellion (talk | contribs)
No edit summary
 
(6 intermediate revisions by 3 users not shown)
Line 1: Line 1:
[[File:Coventry.png|250px|left|CSWDC Coventry]]
{{#vardefine:epr|NP3739PD}}[[Category:EfW Plants]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Coventry has permitted operational capacity of 315,000 tonnes per annum, operated and owned by [[Coventry and Solihull Waste Disposal Company]] ([[CSWDC]]) whose shareholders are [[Coventry City Council]], [[Solihull Metropolitan Borough Council]] and [[Warwickshire County Council]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]].
{{EfWTemplate|EPR=NP3739PD|id=17}}
{{EfWTemplate|EPR={{#var:epr}}|id=17}}
 
[[File:Coventry.png|250px|left|CSWDC Coventry]]__TOC__
<br clear='left' />
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Coventry has permitted operational capacity of 315,000 tonnes per annum, operated and owned by [[Coventry and Solihull Waste Disposal Company]] ([[CSWDC]]) whose shareholders are [[Coventry City Council]], [[Solihull Metropolitan Borough Council]] and [[Warwickshire County Council]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]].
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Coventry has permitted operational capacity of 315,000 tonnes per annum, operated and owned by [[Coventry and Solihull Waste Disposal Company]] ([[CSWDC]]) whose shareholders are [[Coventry City Council]], [[Solihull Metropolitan Borough Council]] and [[Warwickshire County Council]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]].
 
==History==
==History==
The Coventry facility was built to primarily service residual [[Household Waste]] from [[Coventry City Council]] under a long term [[PPP]] which lists tonnage at 245,000 tonnes per annum. The plant was re-furbished in 2012/203 by [[Martin Biopower]] to create a design capacity of 315,000 tonnes per annum<ref>[http://www.martinbiopower.com/projects/case-studies/coventry-successful-transition-through-technology-change/ Martin Biopower Website]</ref>
The Coventry facility was built to primarily service residual [[Household Waste]] from [[Coventry City Council]] under a long term [[PPP]] which lists tonnage at 245,000 tonnes per annum. The plant was re-furbished in 2012/203 by [[Martin Biopower]] to create a design capacity of 315,000 tonnes per annum<ref>[http://www.martinbiopower.com/projects/case-studies/coventry-successful-transition-through-technology-change/ Martin Biopower Website]</ref>
==Plant==
==Plant==
The plant comprises standard combustion over 3 lines, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]]. The plant provides 12,000MWhth of heat to users in Coventry City Centre<ref>[https://www.cswdc.co.uk/ CASWDC Website]</ref>.
The plant comprises standard [[combustion]] over 3 lines of [[grate]] technology, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]]. The plant provides 12,000MWhth of heat to users in Coventry City Centre<ref>[https://www.cswdc.co.uk/ CASWDC Website]</ref>.


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EAIn|EPR={{#var: epr}}}}
{{#clear_external_data:}}
==References==
{{#get_db_data: db=engy
|from=wdfincin|where=epr='NP3739PD'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}


==References==
<references />
<references />