Belfast Harbour Estate: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
m minor text change
Line 7: Line 7:


==Technology==
==Technology==
The plant is a 3 line, grate based technology by [[Biomass Power Limited]], generating steam to turbines delivering 14.85MWe<ref>[https://riverridge.co.uk/app/uploads/2017/03/FCG.pdf RiverRidge Website/Full Circle Generation Brochure]</ref>.
The plant is a 3 line, [[grate]] based technology by [[Biomass Power Limited]], generating steam to turbines delivering 14.85MWe<ref>[https://riverridge.co.uk/app/uploads/2017/03/FCG.pdf RiverRidge Website/Full Circle Generation Brochure]</ref>.


==Construction==
==Construction==
The plant is being constructed under a turnkey [[EPC]] arrangement at a capital cost of GBP £107m by [[Bouygues Energy Services]] who will also operate and maintain the plant for 17 years<ref>[https://www.theconstructionindex.co.uk/news/view/bouygues-signs-146m-contract-for-belfast-waste-plant The Construction Index Article]</ref>.
The plant is being constructed under a turnkey [[EPC]] arrangement at a capital cost of GBP £107m by [[Bouygues Energy Services]] who will also operate and maintain the plant for 17 years<ref>[https://www.theconstructionindex.co.uk/news/view/bouygues-signs-146m-contract-for-belfast-waste-plant The Construction Index Article]</ref>. It is understood that the plant is presently under in an extended testing stage.


==Waste Input==
==Waste Input==