Canford: Difference between revisions
Arctellion (talk | contribs) No edit summary |
m minor text change |
||
| Line 4: | Line 4: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon [[Gasification]] technology. Originally owned and developed by [[New Earth Solutions]] as part of a wider development at the Canford site in Dorset, it was granted planning consent in 2013 and was intended to be operational by 2015, generating 10MWe. The adjacent [[MBT]] plant is operational | An [[EfW]] facility based upon [[Gasification]] technology. Originally owned and developed by [[New Earth Solutions]] as part of a wider development at the Canford site in Dorset, it was granted planning consent in 2013 and was intended to be operational by 2015, generating 10MWe. The adjacent [[MBT]] plant is operational but no construction is understood to have progressed on the [[EfW]] facility. | ||
==Technology== | ==Technology== | ||