==Planning== | ==Planning== | ||
{{#clear_external_data:}} | {{#clear_external_data:}} | ||
{{#get_db_data: db=engy |from=biomass |where=status=' | {{#get_db_data: db=engy |from=biomass |where=status='Planning' |data=site=site,id=id,capacity=capacity,mainfeed=mainfeed}} | ||
The following list summarizes all [[Biomass]] sites that were | The following list summarizes all [[Biomass]] sites that were in Planning as of January 2020, with limited summary information in the table. More detailed information can be found by clicking through to the site-specific page: | ||
[[File:Bioplan.png|600px|right|Locations of Planning Biomass EfWs in the UK]] | [[File:Bioplan.png|600px|right|Locations of Planning Biomass EfWs in the UK]] | ||
{|Class="wikitable sortable" | {|Class="wikitable sortable" | ||
| Line 77: | Line 77: | ||
<br clear=all> | <br clear=all> | ||
==Biomass EFW Sites== | ==Biomass EFW Sites== | ||
In 2017, there were 39 operational Biomass EfW facilities in the UK with an electrical output exceeding 2.5 MW; the total [[Biomass]] capacity of these plants is 5.73 Mt (excluding fuel imported by [[Drax]]), and these plants combined produced 4,226 GWh of power. The [[Biomass]] capacity of UK [[EfW]] plants is generally increasing, and from 2016-2017 the amount of [[Biomass]] being processed by UK facilities increased by 6.9%<ref name='bio1' />. | In 2017, there were 39 operational Biomass EfW facilities in the UK with an electrical output exceeding 2.5 MW; the total [[Biomass]] capacity of these plants is 5.73 Mt (excluding fuel imported by [[Drax]]), and these plants combined produced 4,226 GWh of power. The [[Biomass]] capacity of UK [[EfW]] plants is generally increasing, and from 2016-2017 the amount of [[Biomass]] being processed by UK facilities increased by 6.9%<ref name='bio1' />. | ||