BSW Timber: Difference between revisions
Created page with "Category:Biomass EfW Plants {{BiomassPlant|NAME=BSW Timber|id=17}} 400px|left|BSW Timber Biomass EfW. BSW Timber, 2016. ==Summary== A Bi..." |
No edit summary |
||
Line 1: | Line 1: | ||
[[Category:Biomass EfW Plants]] | [[Category:Biomass EfW Plants]] | ||
{{BiomassPlant|NAME=BSW Timber|id=17}} | {{BiomassPlant|NAME=BSW Timber|id=17}} | ||
[[File:BSW Timber.png|400px|left|BSW Timber Biomass EfW. BSW Timber, 2016.]] | [[File:BSW Timber.png|400px|left|BSW Timber Biomass EfW. BSW Timber, 2016.]]__TOC__ | ||
<br clear='left'/> | |||
==Summary== | ==Summary== |
Revision as of 06:11, 27 April 2020
BSW Timber Operational | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | BSW Timber |
Capacity | 3.2 MWe |
Feedstock | Waste Wood |
EPR (Waste Licence) | 1448 |
ROC | No |
CfD | |
CHP | Yes |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass Waste combined heat and power (CHP) EFW facility utilising a feedstock of Wood Waste to generate 3.2 MW. The facility is located at the BSW sawmill in Carlisle. The electricity generated is used in the sawmill production process and the heat is utilised in the kilns, treatment plant, and offices[1].
This facility was developed in partnership with Dallol Energy[1], and became operational in 2016[2].
Plant
The facility cost £2.5 million to develop and is part of BSW’s £11 million investment programme for biomass energy facilities at its mills in the UK and Latvia[1].