Chilton Power Station: Difference between revisions
No edit summary |
No edit summary |
||
Line 18: | Line 18: | ||
A Biomass Waste EFW facility utilising a feedstock of 120,000 tpa of [[Wood Waste]] to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham. The wood feedstock consists of old pallets, manufacturing off-cuts, wood from the construction and demolition industry and material from civic amenity sites<ref name="ref1" >Lets Recycle, 2011. [https://www.letsrecycle.com/news/latest-news/dalkias-40m-biomass-plant-nears-completion/ Dalkias 40M Biomass Plant Nears Completion - Letsrecycle.Com. Online. letsrecycle.com.[Accessed 6 April 2020].]</ref>. | A Biomass Waste EFW facility utilising a feedstock of 120,000 tpa of [[Wood Waste]] to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham. The wood feedstock consists of old pallets, manufacturing off-cuts, wood from the construction and demolition industry and material from civic amenity sites<ref name="ref1" >Lets Recycle, 2011. [https://www.letsrecycle.com/news/latest-news/dalkias-40m-biomass-plant-nears-completion/ Dalkias 40M Biomass Plant Nears Completion - Letsrecycle.Com. Online. letsrecycle.com.[Accessed 6 April 2020].]</ref>. | ||
The facility has been built and | The facility has been developed, built and continues to be operated by Dalkias, a sister company to Veolia Environmental Services. Construction started in early 2010 and it became operational in 2011<ref name="ref1 />. | ||
==Plant== | ==Plant== |
Revision as of 08:29, 7 April 2020
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass Waste EFW facility utilising a feedstock of 120,000 tpa of Wood Waste to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham. The wood feedstock consists of old pallets, manufacturing off-cuts, wood from the construction and demolition industry and material from civic amenity sites[1].
The facility has been developed, built and continues to be operated by Dalkias, a sister company to Veolia Environmental Services. Construction started in early 2010 and it became operational in 2011[1].
Plant
The facility cost £40 million to develop[1].