Trackwork Waste and Thermal Treatment Facility: Difference between revisions
m add page specific text |
|||
Line 1: | Line 1: | ||
{{BiomassPlant|NAME=Trackwork Ltd|id=83}} | {{BiomassPlant|NAME=Trackwork Ltd|id=83}} | ||
[[Category:Biomass EfW Plants]] | [[Category:Biomass EfW Plants]] | ||
[[File:Pic of Trackwork site.png|400px|left|Picture of Trackwork Biomass EFW site, source Google Streetview]]__TOC__ | |||
<br clear='left'/> | |||
==Summary== | ==Summary== | ||
Line 24: | Line 20: | ||
* Telegraph poles | * Telegraph poles | ||
== | ==Tonnage Input/Fuel== | ||
The plant utilizes hazardous [[Wood Waste]] from the rail network and other commercial and industrial sources and | The tonnage received by the plant in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> was reported by [[Ofgem]] as follows: | ||
{| class="wikitable" | |||
|- | |||
! Biomass !! Tonnage (2018-19) | |||
|- | |||
| [[Wood Waste]] || '''1,507''' | |||
|- | |||
| Other || 0 | |||
|- | |||
| Total||1,507 | |||
|} | |||
The plant utilizes hazardous [[Wood Waste]] from the rail network and other commercial and industrial sources. The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and was '''5,417''' tonnes. | |||
==References== | ==References== | ||
<references /> | <references /> |
Revision as of 16:35, 27 April 2020
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass Waste EFW facility permitted to incinerate up to 35,000 tonnes per annum of Wood Waste generating 3.0MWe to the grid.
The Trackwork site was developed by Trackwork Ltd to process used railway sleepers from the rail network. Due to the hazardous nature of this particular material, the site is permitted as a hazardous waste incinerator. The permit was consolidated with an adjacent transfer station and processing site in November 2010, the consolidated permit allows up to 12,500 tonnes per year on non-hazardous and 42,000 tonnes per year of material to be handled.
Plant
The plant has expanded to take a wider range of hazardous Wood Waste beyond the originally intended railway sleepers[1], including other treated Wood Waste:
- Creosote wood waste
- Copper Chromium Arsenic (CCA) wood waste
- Tanalised wood waste
- Cooling tower wood waste
- Demolition wood waste
- Marine timber waste
- Utility poles
- Telegraph poles
Tonnage Input/Fuel
The tonnage received by the plant in the most recent Annual Sustainability Report for 2018-19[2] was reported by Ofgem as follows:
Biomass | Tonnage (2018-19) |
---|---|
Wood Waste | 1,507 |
Other | 0 |
Total | 1,507 |
The plant utilizes hazardous Wood Waste from the rail network and other commercial and industrial sources. The Wood Waste tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and was 5,417 tonnes.