Chilton Power Station: Difference between revisions
No edit summary |
Changed picture |
||
Line 1: | Line 1: | ||
[[Category:Biomass EfW Plants]] | [[Category:Biomass EfW Plants]] | ||
{{BiomassPlant|NAME=Chilton|id=20}} | {{BiomassPlant|NAME=Chilton|id=20}} | ||
[[File:Chilton.jpg|400px|left|Chilton Biomass EfW. | [[File:Chilton Biomass Energy Centre County Durham - geograph.org.uk - 2430058.jpg|400px|left|Chilton Biomass EfW. Geograph, 2011.]]<ref>Robinson, P., 2011. [https://www.geograph.org.uk/photo/2430058 Chilton Biomass Energy Centre County Durham. Online. Geograph.org.uk. [Accessed 7 April 2020].]</ref> | ||
Revision as of 08:37, 7 April 2020
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass Waste EFW facility utilising a feedstock of 120,000 tpa of Wood Waste to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham. The wood feedstock consists of old pallets, manufacturing off-cuts, wood from the construction and demolition industry and material from civic amenity sites[2].
The facility has been developed, built and continues to be operated by Dalkias, a sister company to Veolia Environmental Services. Construction started in early 2010 and it became operational in 2011[2].
Plant
The facility cost £40 million to develop[2].