Birmingham Bio Power: Difference between revisions
Created page with "Category:Biomass EfW Plants {{BiomassPlant|NAME=Birmingham Bio Power|id=14}} 400px|left|Birmingham Bio Power. CoGen, 2018. ==..." |
No edit summary |
||
| Line 22: | Line 22: | ||
The facility utilises Nexterra’s fixed-bed updraft [[gasification]] system technology, which is an [[Advanced Conversion Technology]]. MWH Treatment provided EPC services for the project<ref>Nexterra, 2014. [https://www.nexterra.ca/files/pdf/Project_Profile_BBPL20140105.pdf Birmingham Bio Power Ltd. Online. Nexterra.ca. [Accessed 3 April 2020].]</ref>. | The facility utilises Nexterra’s fixed-bed updraft [[gasification]] system technology, which is an [[Advanced Conversion Technology]]. MWH Treatment provided EPC services for the project<ref>Nexterra, 2014. [https://www.nexterra.ca/files/pdf/Project_Profile_BBPL20140105.pdf Birmingham Bio Power Ltd. Online. Nexterra.ca. [Accessed 3 April 2020].]</ref>. | ||
The project has an estimated cost of £47.8m which was financed Green Investment Bank (GIB), Balfour Beatty, Eternity Capital Management, Foresight’s UK Waste Resources and Energy Investments (UKWREI) fund, and Carbonarius’s GCP Infrastructure Fund (GCP)< | The project has an estimated cost of £47.8m which was financed Green Investment Bank (GIB), Balfour Beatty, Eternity Capital Management, Foresight’s UK Waste Resources and Energy Investments (UKWREI) fund, and Carbonarius’s GCP Infrastructure Fund (GCP)<ref name="ref1" />. | ||
This facility has been replicated by its sister project [[Welland | Welland Bio Power]]. | This facility has been replicated by its sister project [[Welland | Welland Bio Power]]. | ||